Similar Projects
Grading, Drainage, Paving, Signing, Signals, and Structures
Infrastructure
Bidding
$3,000,000 est. value
Fayetteville, NC 28312

Crown Coliseum Swale Repair
Infrastructure
Post-Bid
Fayetteville, NC

22-08-SW Linear Park Drain Line Repair
Infrastructure
Post-Bid
Fayetteville, NC 28301

Replace Grounds in the 1-7 ADA BN Motor pool X4622, Fort Bragg, NC
Results
Fayetteville, NC 28307

Headwall
Results
Fayetteville, NC 28301

LEC Storm Drainage Control
Infrastructure
Post-Bid
Fayetteville, NC 28301

Reinforced Concrete Pipe
Term Contract
Results
Fayetteville, NC 28302

Corporation Drive Outfall
Infrastructure
Post-Bid
NC

Drainage Assistance Program 502 Argyll Road
Results
Fayetteville, NC 28301

DAP Project - Paisley Avenue
Infrastructure
Post-Bid
Fayetteville, NC 28304

Big Rockfish Creek Outfall - Contract 1
Results
Less than $7,895,205 est. value
Fayetteville, NC 28302

Fayetteville Regional Airport Embankment and Pipe Repairs
Results
Fayetteville, NC

Drainage Assistance Project Daytona Road
Results
Fayetteville, NC 28311

Corrugated Aluminum Pipe
Results
Fayetteville, NC 28306

Aluminum Box Culvert
Results
Fayetteville, NC 28306

Last Updated 05/03/2022 10:50 AM
Project Title

Range 190E Erosion Control

Physical Address View project details and contacts
City, State (County) Fort Bragg, NC   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to: addressing erosion control and drainage at the Range 190E site through the installation of Reinforced Concrete Pipe (RCP) storm drain lines of varying diameters from 18” to 42” with 6” lateral drains feeding to RCP. Project also includes construction of manholes and endwalls with rip-rap at junctions and ends of RCP runs and re-grading of the site. There will be some pavement repair after drain lines are installed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents