Similar Projects
Fire Alarm Upgrade, Seekonk Commons 667-1
Results
Less than $345,703 est. value
Seekonk, MA 02771

Fire Alarm Maintenance and Testing Taunton State Hospital
Term Contract
Results
$100,000 est. value
Taunton, MA 02780

Fire Sprinkler Testing and Repair Services
Results
Less than $30,000 est. value
Taunton, MA

Update Existing Fire Alarm Systems (Firelink) in Seven Buildings
Term Contract
Results
Less than $14,300 est. value
Attleboro, MA 02703

Fire Alarm Replacement Phase 1, Brookside 667-4
Results
Less than $33,000 est. value
Attleboro, MA 02703

Existing Edwards System Technology(EST) Fire Alarm System
Term Contract
Post-Bid
Less than $100,000 est. value
Taunton, MA

Fire Panel Control Panel Upgrades
Results
$42,680 est. value
Fall River, MA 02720

Inspection, Testing, Maintenance of Fire Preventive Systems
Post-Bid

Fire Alarm Services
Term Contract
Results
Less than $59,850 est. value
New Bedford, MA 02740

667-1 Fire Alarm Upgrades and Emergency Hallway Lighting
Results
$162,000 to $162,768 est. value
Acushnet, MA 02743

Fire Stations - Station Alerting
Post-Bid
New Bedford, MA 02740

Fire Alarm System Upgrade at Martin Court - Phase II
Bidding
$325,000 est. value
Swansea, MA

Hillside Court Fire Alarm System Upgrade Project
Bidding
Less than $225,000 est. value
New Bedford, MA 02746

Fire Alarm Device Testing, Inspection and Repair Services
Term Contract
Results
Less than $80,000 est. value
Fall River, MA 02722

Fire Alarm System - Addressable, South Washington Street 667-3
Results
Less than $15,000 est. value
North Attleborough, MA 02760

Last Updated 12/06/2019 12:53 PM
Project Title

DMH Taunton State Hospital - Goss Building - Fire Protection Upgrade - General Bid

Physical Address View project details and contacts
City, State (County) Taunton, MA 02108   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,544,455
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Installation of a fire protection system, including new fire service water line and full sprinkler coverage throughout the basement, 1st through 4th floors and attic. The new sprinkler system devices include water flow switches, tamper switches, pressure switches and low pressure switches. Replacement of ceilings in some areas, including removal and reinstallation of some ceiling devices and some new ceiling devices.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents