Similar Projects
Electric, Finishes/Exterior, HVAC, Plumbing Construction Project Lead, Park Forest, IL (Cook County)
Last Updated | 01/21/2022 10:06 AM |
Project Title | Downtown Unit 299 Main Street |
Physical Address | View project details and contacts |
City, State (County) | Park Forest, IL (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric, Finishes/Exterior, HVAC, Plumbing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | General Construction: Frame all walls floor to ceiling with 2x4 steel studs 160 o.c. Build soffit over interior entry and knee walls Install 5/8 drywall floor to ceiling, tape and sand ready for all walls Insulate exterior walls R-15 Frame and drywall the washroom and mechanical room Install 2x4 suspended ceiling at 10’ from floor Install white ceiling grid with non-directional 2x4 white ceiling tiles Install 2-prehung 3’x6’8” paint grade doors and trim. Install lever handle door knobs Grab bars, mirror, and tp holder in washroom Build shelf in mechanical room for hot water heater Prime 1 coat all walls and soffit Install Armstrong Excelon vinyl tile and vinyl base in washroom and mechanical room Electric: Install 200 amp circuit panel. Meter existing Install 20 – 2x4, 2- 2x4, LED lay in light fixtures Install 7 outlets to code. Install 2-gfi outlets. Install circuit for future sign Install 1- exit/emergency signs. 1-emergency light in washroom Install 4 LED-can lights in entry soffit, 2 window outlets Install exhaust fan vented to the outside Install wiring for furnace and a/c Install switching for lighting and power to hot water heater HVAC: Payne or equal Install Payne 95% single stage furnace Install Payne 5-ton R-410A condenser Install Carrier 5-ton R-410 cased coil Install supply and return duct work and insulate Install supply and return grills (up to 12 supplies and 2 returns) Install all flue from furnace out back wall or roof Install condensing unit flat roof or exterior wall Install Honeywell programmable thermostat Plumbing: Install rough supply and waste plumbing Install ADA sink and faucet. Install ADA toilet Install utility sink and faucet in mechanical room Install 20 gal electric hot water heater on shelf over laundry tub Install gas piping for furnace from existing meter bank Sprinklers: Remove and install 20 sprinklers up and down as per code |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |