Similar Projects
Lingle to Lusk US 85(JCT Wy 156/157) - N853100 - Goshen County
Infrastructure
Conception
$8,586,000 CJ est. value
Lingle, WY 82223

Lingle to Lusk US 85(JCT Wy 156/157) - N853100 - Goshen County
Infrastructure
Conception
$8,586,000 CJ est. value
Lingle, WY 82223

Tunnel #2 Cave-in Restoration
Alteration
Post-Bid
Torrington, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Crack Seal
Infrastructure
Results

Milling Plant Mix, Bituminous Pavement Surfacing and Miscellaneous
Infrastructure
Results

Torrington Retail Development
New Construction, Infrastructure
Conception
Torrington, WY 82240

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

Bituminous Pavement Surfacing
Infrastructure
Results

FY23 Public Works Facility Garage Addition
Addition, Demolition, Infrastructure
Post-Bid
$420,000 CJ est. value
Torrington, WY 82240

District 2 Chip Seal
Infrastructure
Results

City of Torrington - FY2020 Wastewater Pre-Treatment Facility Project
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Torrington, WY 82240

Walk Path Phase II
Infrastructure
Results
$400,000 est. value
La Grange, WY

FY23 Golf Course Parking Lot Improvements (Phase I)
Infrastructure
Post-Bid
$190,000 CJ est. value
Torrington, WY 82240

Shuck Street Water Improvements
Infrastructure
Results
$78,187 CJ est. value
Yoder, WY 82244

Last Updated 12/12/2022 02:13 PM
Project Title

Southwest Wyoming Mental Health Center

Physical Address View project details and contacts
City, State (County) Torrington, WY 82240   (Goshen County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The location and scope details have not been released. As of December 12, 2022 the project is in planning stage and seeking preliminary plat approval from the Torrington City Council approved a preliminary plat on November 15, 2022. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the second quarter of 2023.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents