Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Saylorville Shoreline Erosion Protection Project
Term Contract
Design
Johnston, IA 50131

Willow Creek Streambank Stabilization
Infrastructure
Bidding
$170,000 est. value
Iowa City, IA 52246

Sunset Dr/IA Highway 28 and North Avenue Intersection Improvements
Infrastructure
Bidding
$2,088,769 est. value
Norwalk, IA

Upper Wapsipinicon WMA - Phase 6 Watershed Improvements
Infrastructure
Post-Bid
IA

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Post-Bid
$17,655,000 est. value
Burlington, IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management Project
Term Contract
Design
$10,000,000 est. value
Cedar Rapids, IA

Pipe Culverts
Infrastructure
Bidding
IA

Fort Randall-Sioux City 230-Kv Transmission Line, Structure 103/4, Access Ramp and Tower Erosion Repair, IA
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Sioux City, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

Last Updated 01/07/2022 11:03 AM
Project Title

Main Open Ditch Repairs

Physical Address View project details and contacts
City, State (County) Mason City, IA   (Cerro Gordo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $428,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of three separate construction division. Division 1 consists of construction of 214.5 stations of open ditch excavation, 214.5 stations of spoil bank leveling, 214.5 stations of open ditch seeding and fertilizing, riprap placement, repairs to surface drainpipes and tile extension pipes, and all other miscellaneous items related thereto. Division 2 consists of construction of approximately 2 60 LF of 72” diameter RCP culverts, 525 CY of class 20 excavation, existing pipe removal, safety closures, rural seeding and fertilization, and all other miscellaneous items related thereto. Division 3 consists of construction of approximately 72 LF of 54” diameter CMP culvert, 875 CY of class 20 excavation, existing pipe removal, safety closures, rural seeding and fertilization, and all other miscellaneous items related thereto

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents