Similar Projects
Great Lakes National Program Office - Remediation
Post-Bid
Less than $300,000,000 est. value
Chicago, IL - Muskegon, MI - Duluth, MN

Village Green Basin Expansion
Addition
Results
Fridley, MN 55432

Last Updated 12/16/2020 07:58 AM
Project Title

New London Pond Reshaping

Physical Address View project details and contacts
City, State (County) New London, MN 56273   (Kandiyohi County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove all bottom material which includes (sediment/muck/plant material) necessary to grade out at no less than 0.5% slope from the kettle at the lower end (sill elevation of the kettle notches) to the upper end of each pond and at -0.5% from the toe of the banks to the kettle so the pond drains towards the kettle from all directions. Banks slopes impacted by pond bottom removal shall be regraded to 2:1 max slope. After bottom material has been removed additional work includes bank riprapping and kettle sand blanket.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents