Similar Projects
Triton Square
New Construction
Conception
$1,470,000 est. value
Groton, CT 06340

Colonel Ledyard School Redevelopment
Renovation - 61,134 SF
Design
Groton, CT

Village Apartments
New Construction
Design
Montville, CT 06382

Abatement and Demolition of Thames River Apartment Complex
Demolition - 414,000 SF
Post-Bid
New London, CT

Pequot Village
New Construction - 50,365 SF
Post-Bid
$9,000,000 to $10,000,000 est. value
Waterford, CT 06385

Pleasant Valley
New Construction
Construction
$18,000,000 est. value
Groton, CT 06340

Perkins Farm Development
New Construction - 47,000 SF
Construction
$60,000,000 est. value
Mystic, CT 06355

Route 2 Apartments
New Construction
Pending Verification
$1,000,000 est. value
Pawcatuck, CT

Waterford Heights
New Construction
Design
Waterford, CT 06385

Development of Former YMCA Property
New Construction, Renovation - 49,130 SF
Post-Bid
Norwich, CT 06360

Thames River Apartments Redevelopment
New Construction, Demolition
Construction
$3,700,000 est. value
New London, CT 06320

Main Street Redevelopment
Addition
Design
East Lyme, CT 06357

Perkins Reserve
New Construction - 4,200 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Mystic, CT 06355

Gateway Commons
New Construction - 425,000 SF
Construction
$10,000,000 CJ est. value
East Lyme, CT

Rocky Neck Village
New Construction - 900,000 SF
Construction
$14,000,000 est. value
East Lyme, CT

Reported 06/03/2022 12:00 AM
Project Title

Harbor Heights - Phase II

Physical Address View project details and contacts
City, State (County) Stonington, CT 06378   (New London County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding, Construction Start Expected October 2022, Construction Completion Expected second quarter 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Apartments/Condominiums, 173,000 SF New Construction, 123 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents