Similar Projects
Weatherization Assistance Program
Alteration
Bidding
Oakland, MI

FM Building RTUs Replacement
Alteration
Bidding
Rochester, MI 48309

CDBG Mobile Home Furnace Replacement
Term Contract
Post-Bid
Rochester Hills, MI

Air Duct Cleaning at City of Pontiac Buildings
Post-Bid
Pontiac, MI

Preferred Campus Wide Dryer Vent and Forced Air Furnace Cleaning Services
Term Contract
Results
Rochester, MI

Springfield Oaks HVAC
Results
Davisburg, MI 48350

New Walk-In Freezer at Power Middle School
Post-Bid
Farmington, MI 48335

HVAC, Boiler, and Tube Heater Repair Services and Parts
Results
Beverly Hills, Davisburg, Lake Orion, Milford, Southfield, Troy, Waterford, MI

HVAC Professional Services
Term Contract
Post-Bid
Auburn Hills, MI 48326

Civic Center HVAC Controls Upgrades
Results
Less than $130,000 est. value
Novi, MI

Kettering High School Classroom AC and Mott High School Chiller Replacement
Post-Bid
Waterford Township, MI 48329

Oakland Community College Royal Oak Air Handling Unit HV1A and HV1E Upgrades
Results
Less than $174,000 est. value
Royal Oak, MI 48067

HVAC and Mechanical Products
Term Contract
Post-Bid

Install Condenser
Results
Royal Oak, MI

Novi Gardenbrook Building (Old Wash Collage) Bid Package #7
Post-Bid
Novi, MI 48375

Last Updated 12/10/2021 07:37 AM
Project Title

2018 Bond Program - Scripps Middle School Site and Building Improvements - Bid Package 1 HVAC

Physical Address View project details and contacts
City, State (County) Lake Orion, MI 48360   (Oakland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Contractor shall provide all labor, materials, equipment, permits, inspection fees, utility company charges, supervision and other items indicated in the contract General Conditions necessary to yield completely operable and tested systems as shown on the drawings and as specified herein. The Work includes, but is not limited to, the following: B. Hydronic hot water heating and chilled water cooling systems. 1. Demolition of existing systems as shown. 2. Modifications to the existing hydronic hot water heating system(s). 3. Modifications to the existing chilled water cooling system(s). 4. Furnishing and installing of glycol mixtures, including glycol feed equipment. 5. Chemical treatment equipment for above systems. 6. Filtration equipment for above systems. C. HVAC 1. Demolition of existing systems as shown. 2. New air handling systems and equipment. 3. Modifications to the existing air handling systems and equipment. 4. New refrigerant piping systems, including charging of systems. 5. Installation of duct smoke detectors furnished by the Electrical Contractor. 6. Coordination of smoke detector interface with the fire alarm system and with the operation of air handling equipment and devices. 7. Combustion air and venting for fuel-fired appliances/equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents