Similar Projects
Replacement of a Culvert on Northcote Drive
Infrastructure
Bidding
Mountain Brook, AL 35223

Intersection Improvements (Grading, Drainage, and Pavement) on SR-8 (US-80)
Infrastructure
Bidding
$2,984,214 to $3,647,373 est. value
Livingston, AL 35470

Lowe House - Grounds, Drainage, and Pavement Repairs and Improvements
Post-Bid
Huntsville, AL 35899

Delta Port Parking Lot and Shoreline Improvements
Post-Bid
Dauphin Island, AL

Berth 2 Fender Repairs From M/V Maxx B. Allision
Results
Mobile, AL 36602

Soil Erosion Control
Results
Birmingham, AL

BayPointe Hospital Retaining Wall
Alteration
Construction
Mobile, AL 36693

South Vinemont/ Jack's Family Restaurant CDBG Project
Infrastructure
Bidding
$400,000 est. value
Vinemont, AL

12 Mile Creek Headwater Restoration Project
Post-Bid
Mobile, AL

Drainage Improvements for Oak Street and Section Street at Bid Mouth Gully
Results
Less than $233,415 est. value
Fairhope, AL 36532

Moore Softball Complex Dugouts, Drainage and Stormwater Runoff Improvements
Infrastructure
Bidding
$200,000 est. value
Auburn, AL 36832

Drainage and Roadway Improvements for the Roadway Improvements for Atchison Parkway
Post-Bid
Chelsea, AL

Shorter Street Drainage Improvements
Results
Madison, AL 35758

Widening and Drainage Improvements along Mountain Street North East
Infrastructure
Bidding
$210,000 est. value
Jacksonville, AL 36265

Drainage Rehabilitation (Materials Only)
Post-Bid
Robertsdale, AL

Reported 04/28/2022 12:00 AM
Project Title

2900 Norwood Boulevard Drainage Improvements

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35234   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Principal Items of Work related to this project are: Description - Unit - Amount Mobilization LS 1 Geometric Controls LS 1 Asphalt Pavement Removal SY 990 Granite Curb Removal LF 785 Existing Storm Sewer Pipe Removal LF 90 Existing Inlet Removal EA 2 18" RC Storm Sewer Pipe, Class III, Wall B LF 233 24" RC Storm Sewer Pipe, Class III, Wall B LF 16 36" RC Storm Sewer Pipe, Class III, Wall B LF 21 48" Diameter Precast RC Manhole VF 11 60" Diameter Precast RC Manhole VF 8 Inlet, ALDOT Type S1 or S3 (1 Wing) EA 1 Inlet, ALDOT Type S1 or S3 (2 Wing) EA 3 Precast RC Headwall, 18" Pipe EA 1 Combination Concrete Curb & Gutter, Type C LF 680 Crushed Aggregate Base Course, 6" Compacted SY 1075 Bit. Concrete Wearing Surface, 1.5" Compacted SY 1075 Bit. Concrete Binder Layer, 4" Compacted SY 1075

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents