Similar Projects
Heritage & Paddock Parks Renovations & Site Improvements
Infrastructure
Conception
$13,500,000 est. value
Fort Worth, Keller, TX 76248

Trail Lakes Multi-Family
New Construction, Infrastructure - 61,770 SF
Design
$6,500,000 CJ est. value
Fort Worth, TX 76133

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Design
$12,862,400 CJ est. value
Fort Worth, TX 76109

Lake Street Between Pond Street and Tarrant Street, Drainage and Water Improvements
Post-Bid
$186,300 est. value
Mansfield, TX 76063

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Waterline Improvements for 3rd Street (North Road to Cory A Edwards Drive)
Results
$444,000 est. value
Kennedale, TX

Preventive Maintenance
Results
$3,233,923 est. value
TX

Key School
New Construction
Construction
Fort Worth, TX 76119

Murphy Express #8961 / Bedford
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Bedford, TX 76021

Scooters Coffee #489 / Fort Worth
New Construction, Infrastructure - 664 SF
Pending Verification
$350,000 CJ est. value
Fort Worth, TX 76135

Scooters Coffee #489 / Fort Worth
New Construction, Infrastructure - 664 SF
Pending Verification
$350,000 CJ est. value
Fort Worth, TX 76135

Murphy Express #8610 / Fort Worth
New Construction, Infrastructure - 2,800 SF
Design
$2,500,000 CJ est. value
Fort Worth, TX 76102

Street Sweeping
Term Contract
Post-Bid
Arlington, TX

Resurface Roadway
Results
$2,169,359 est. value
TX

The Watercress Amenity Center & Site Development
New Construction
Construction
Haslet, TX 76052

Last Updated 09/07/2022 07:03 AM
Project Title

Dove Creek Trail and West Highland Street Drainage Improvements

Physical Address View project details and contacts
City, State (County) Southlake, TX 76092   (Tarrant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $580,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: Dove Creek Trail (255 SY of 6" PCCP, 45 LF of 7'x3' Triple Barrel RCB) Base Bid: Mission Drive (121 SY of 6" PCCP, 45 LF of 5'x3' Triple Barrel RCB) Base Bid: San Saba Drive (163 SY of 6" PCCP, 43 LF of 36" Quadruple Barrel RCP) Alt. 1 Bid: West Highland Street (1276 SY of 8" HMAC paving, 45 LF of 8'x4' RCB) Alt. 2 Bid: West Highland Street (1276 SY of 6" PCCP paving, 45 LF of 8'x4' RCB) 180 calendar days from the issuance of Notice to Proceed

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents