Similar Projects
Panguitch High School South Parking Lot Improvement Package
Post-Bid
Panguitch, UT 84759

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

UDOT Burr Trail Turn Lanes
Term Contract
Results
Boulder, UT 84716

Moenave Trail Improvements
Results

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

SR-63/SR-12 Roundabout and Rehabilitation Rehabilitation High Volume
Results
$6,000,000 to $10,000,000 est. value
UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

Improvements to the Panguitch Municipal Airport
Infrastructure
Post-Bid
Panguitch, UT 84759

300 West Reconstruction from 900 South to 2100 South
Results

Asphalt Preservation and Re-striping and Seal Coat at Bryce Canyon National Park
Infrastructure
Post-Bid
$100,000 to $250,000 est. value
Bryce, UT

Construction of the Main Street Improvements
Results
Less than $396,000 est. value
Bryce Canyon, UT

S Roadway Improvements
Results

Anasazi State Park Parking Lot Improvements
Infrastructure
Results
$200,000 est. value
Boulder, UT 84716

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

Reported 06/01/2022 12:00 AM
Project Title

Contractor - Construction of Highways, Streets, Bridges, and Railways

Physical Address View project details and contacts
City, State (County) Lake Powell, UT   (Garfield County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected May 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of pavement management and rehabilitation of roads and parking areas within Natural Bridges National Monument. This work includes but is not limited to, pavement milling and removal, full depth replacement (FDR) of asphalt, full and partial depth repairs, asphalt construction, crack seal, fog seal, shoulder stabilization, curbing, pavement markings, guardrail, gate replacement, cattle guard replacement, MUTCD sign installation, concrete placement, and construction and repair of drainage features and structures.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents