Similar Projects
J045--Boiler Life Expectancy and Damage Assessment Inspection
Bidding
Columbia, SC 29209

Adjutant General Water Heater Replacement
Post-Bid
$63,000 to $73,000 est. value
Columbia, SC

Aerco Wizard Steam Fired Water Heater
Post-Bid
Columbia, SC 29210

J--Water Treatment Boiler and Chiller Plant SDVOSB or VOSB Set-Aside _ Dependent Upon Responses Received
Results
Columbia, SC

Intellihot Water Heaters
Term Contract
Results
Columbia, SC 29210

PVI Water Heater Replacement
Post-Bid
Blythewood, SC 29016

Aerco Smartplate Water Heater
Results
Less than $33,420 est. value
Columbia, SC

UOFSC FY21-1206 Flora-1st Floor Mechanical UPFIT
Post-Bid
$300,000 to $400,000 est. value
Columbia, SC 29201

Gressette Building Combined Mechanical Projects
Results
$656,222 est. value
Columbia, SC

Blatt Building Replace Terminal Hot Water Reheat 5Th Floor & Edgar Brown Building Replace Terminal Hot Water Reheat 5Th Floor
Post-Bid
$750,000 to $900,000 est. value
Columbia, SC 29201

Hot Water Boilers - Midlands Eval. Center
Results
$48,800 est. value
Columbia, SC 29210

South Carolina Archives and History Building - Replace Hot Water Heater(S)
Post-Bid
$35,000 to $40,000 est. value
Columbia, SC 29223

Kirkland Correctional Institution - Boiler Replacement
Results
$680,000 to $739,725 est. value
Columbia, SC

Water Treatment Services
Term Contract
Results
Columbia, SC 29201

Boiler/Water Heater Penthouse
Results
Columbia, SC 29210

Reported 09/19/2020 12:00 AM
Project Title

SC Department of Archives and History - Boilers Blowdown Separator

Physical Address View project details and contacts
City, State (County) Columbia, SC 29223   (Richland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $25,000 to $35,000
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the addition of a blowdown separator system and aftercooler to serve (2) existing boilers in the Archives building. Project will include BDS equipment. Piping together the two boilers. domestic water supply for the aftercooler. venting through the roof and new sink drain with associated sanitary piping.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents