Similar Projects
Reported | 08/20/2021 11:20 AM |
Project Title | Water Treatment Plant Improvements |
Physical Address | View project details and contacts |
City, State (County) | Lake Havasu City, AZ (Mohave County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Bidding Expected third quarter 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,782,500 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct enclosures over certain treatment components of the water treatment plant. These components are the Biological Filters and Cascade Aerator. Dust from the nearby concrete plant covers the exposed pipes within the aeration facility and likely is also blown into the open water. A more permanent structure would prevent dust from the neighboring facility entering the treatment process. The second improvement is to install a flow meter on the 18 IN bypass pipe within the plant footprint. This will provide more accurate flow meter data, during times of isolation or repairs. The third improvement is related to the chlorine disinfection system. The Water Master Plan also recommends that the City evaluate ways to minimize handling of the one-ton chlorine cylinders, replacement of existing shade structure with a new chlorine building and switch from gaseous chlorine to liquid sodium hypochlorite. These are related to safety as well. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Water Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |