Similar Projects
Last Updated | 10/17/2023 07:06 PM |
Project Title | Marion Center Bridge #1 |
Physical Address | View project details and contacts |
City, State (County) | Marion Center, PA 15759 (Indiana County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,500,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Project is the Replacement of the Existing Structure a Concrete Slab Bridge Carrying Pa 403 Over a Tributary to Pine Run With a New Reinforced Concrete Box Culvert and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0403, Section 456, in Indiana County Marion Center Borough From Approximately 400 Feet From the Start of the Existing Structure at Segment 0710 Offset 2227 to Approximately 350 Feet From the End of the Existing Structure at Segment 0720 Offset 0327. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 33.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Marion Center Bridge #1 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room. The unit price includes labor, materials, equipment, excavation, aggregate, and geotextile to install and remove temporary sidewalk. This work is the installation, construction and removal of a temporary pipe cap |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |