Similar Projects
Haskell School Parking Lot Replacement
Post-Bid
Rockford, IL 61103

Sterling Holley Parking Lot Sealing and Striping
Post-Bid
Rockford, IL 61104

Cherry Valley School North Parking Lot Reconstruction
Results
Rockford, IL 61109

Swanson Park Path Improvements
Results
Cherry Valley, IL 61016

Parking Lot Improvements at Marshall Middle School
Renovation, Infrastructure
Post-Bid
Rockford, IL 61103

City-Wide Sidewalk & ADA Repairs Package #2
Results
Rockford, IL 61104

River Lane Reconstruction
Infrastructure
Post-Bid
Loves Park, IL 61111

Main Terminal Parking Lot Rehabilitation
Results
Rockford, IL 61109

Bike Path Runoff Repair
Results
Rockford, IL 61101

City Wide Sidewalk and ADA Repairs Package 3
Results
Less than $114,574 est. value
Rockford, IL 61104

City Wide Sidewalk and ADA Repairs Package 4
Results
Less than $95,731 est. value
Rockford, IL 61104

Sidewalk Improvements
Results
Less than $59,440 est. value
Cherry Valley, IL 61016

Municipal Parking Lot Improvements
Results
Less than $121,909 est. value
Cherry Valley, IL

East State & New Towne Pedestrian Improvements
Results
Less than $377,856 est. value
Rockford, IL 61108

Repair Stairway and Sidewalk
Results
Less than $400,000 est. value
Rockford, IL 61114

Last Updated 06/29/2021 11:34 AM
Project Title

Blackhawk Parking Lot

Physical Address View project details and contacts
City, State (County) Rockton, IL 61072   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $74,391
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements include Earth Excavation, Pavement Removal, PCC Curb and Gutter Removal, PCC Sidewalk, PCC Curb and Gutter, PCC Channel, HMA Surface Course, Storm Sewer Class A, and Catch Basin Type C. This project includes the complete reconstruction of the lower half of a parking lot as well as the placement of a new catch basin and storm sewer which is to connect to an existing street inlet.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents