Similar Projects
The Brixx Apartments Phase I
New Construction, Infrastructure
Conception
$14,500,000 est. value
Sioux Falls, SD 57107

The Brixx Apartments Phase I
New Construction, Infrastructure
Conception
$14,500,000 est. value
Sioux Falls, SD 57107

Block 5 Project
New Construction, Infrastructure - 5,000 SF
Design
$60,000,000 CJ est. value
Rapid City, SD 57701

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Springbrook Acres Water Main and Pressure Reducing Valve Abandonment Rebid
Infrastructure
Bidding
$1,200,000 CJ est. value
Rapid City, SD 57702

Scour Protection
Infrastructure
Bidding
$734,000 CJ est. value
Belle Fourche, SD 57717

Signing and Delineation
Infrastructure
Sub-Bidding
$958,000 CJ est. value
Tyndall, SD 57066

Airport Improvements
New Construction
Post-Bid
Hot Springs, SD 57747

Miller Ranch Subdivision Phase 1
Post-Bid
Spearfish, SD 57783

Sturgis Community Center Pool Resurfacing
Results
Sturgis, SD 57785

Warner Track and Field Reconstruction
Renovation
Results
Warner, SD 57479

Sanford Sports Complex
New Construction
Construction
Less than $50,000,000 est. value
Sioux Falls, SD 57107

Aspen Heights Apartments
New Construction, Infrastructure
Construction
Sioux Falls, SD 57107

The Crossroads Mixed Commercial Development
New Construction, Demolition, Infrastructure
Pending Verification
Sioux Falls, SD

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

Last Updated 07/28/2022 11:56 PM
Project Title

Wellness Center Expansion

Physical Address View project details and contacts
City, State (County) Vermillion, SD 57069   (Clay County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

GeoTek #21-L03 The University of South Dakota is expanding the Wellness Center. The addition will be located on the south side of the existing building in Vermillion, SD and approximately 45,500 GSF. The aquatic center addition will include spaces such as competition pool, activity pool, spa, pool equipment, storage, spectator seating, sauna, classrooms, team locker rooms and wellness locker room expansion, family locker room, and public restrooms. The addition will also include a wet classroom, coaches offices, aquatics manager's office, a conference room, custodial spaces, and mechanical and electrical spaces There will NOT be a pre-bid meeting. Campus contact is Brian Muehlbeier, 605-658-3311, Brian.Muehlbeier@usd.edu . OSE contact is Sara Norstrom, Sara.Norstrom@state.sd.us . Bidder further agrees the Plans and Specifications are the sole property of the State; Each bid in excess of $100,000.00 must be accompanied by a certified check, cashier's check, or draft in the amount of 5% of the base bid and all add alternates and drawn on a State or National Bank, or a 10% bid bond issued by a surety authorized to do business in the State of South Dakota and made payable to Journey Construction. The Journey Construction reserves the right to reject any or all bids and to waive any irregularities therein. *Addendum 1, 2 and 3 have been released. *Reminder: This is an OSE project and bids MUST be submitted according to document 00-2113 - Bidders Instructions. A few notes: - Bids must be submitted in a sealed envelope directly to the Office of the State Engineer - Bids over $50,000 must be accompanied with a 10% bid bond or 5% cashier's check

Details

48,064 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents