Similar Projects
Construction of Horace Sisk Roof Replacement Phase II
Alteration
Bidding
Fayetteville, NC 28303

Kennedy and Fletcher Theater Roof Replacement
Post-Bid
Neuse, NC 27604

Snoopy Hangar Roof Replacement and Repairs
Post-Bid
Charlotte, NC 28208

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing MACC
Post-Bid

Plemmons Student Union Selective Roof Replacement
Results
Boone, NC 28608

Partial Roof Replacement Ligon Middle School Areas
Post-Bid
$500,000 to $600,000 est. value
Raleigh, NC 27601

Removal and Replacement of the Roof at West View Elementary School
Results
Less than $948,300 est. value
Garner, NC 27529

Metal Carport
Post-Bid
Morganton, NC

Replacement of Roof Trexler Middle School
Results
Richlands, NC 28574

Replacement of Rooftop MUA and AHU Units at Durham County Detention Center
Post-Bid
Durham, NC

605 Pump Station and Bain Pump Station Roof Replacement
Term Contract
Results
Raleigh, NC 27614

Southport Elementary Roof Replacement
Post-Bid
Southport, NC 28461

Intergenerational Community Center Building #5 (Chapel) Roof Replacement
Results
Greenville, NC 27834

Reported 11/17/2021 12:00 AM
Project Title

NC Zoological Park - Africa Plains Barn B - Roof Replacement

Physical Address View project details and contacts
City, State (County) Asheboro, NC   (Randolph County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace metal R-Panel ceiling with perforated galvalume R-panels and metal roofing with 24 ga. standing seam roof panels with Galvalume Plus coated both sides and replace translucent panels. Replace insulation with new R-19 insulation and repair and paint any damaged z-girts and purlins or replace. Remove all electrical conduits, lighting and heating elements and replace as per plans. Reuse any electrical conduit providing it meets all applicable codes. Repair work to include all necessary appurtenances required for standard industry roof replacement and repair. Includes removing and replacing lights and anything connected to ceiling in order to safely replace ceiling and roofing materials. Animal boarding wall ceiling top connections if cut must be welded and welds smoothed and galvanized coating repaired using galvanizing repair sticks. Garage Door base framing to be repaired by cutting out and replacing damaged sections of steel C's approximately 36 inches high above finished floor elevation.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents