Similar Projects
Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Middlefield Park Masterplan
New Construction, Demolition - 1,467,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA 94043

The Seminary at Strawberry
New Construction
Design
Mill Valley, CA 94941

Warner Center Life Plan Community - Woodland Hills
New Construction - 758,835 SF
Design
$10,000,000 CJ est. value
Los Angeles, CA 91367

Day Use Lot Two Overlay
Renovation
Bidding
$80,000 est. value
Big Sur, CA 93920

Mini Parks Playground Equipment Replacement
Renovation
Bidding
Merced, CA 95341

Park: All Inclusive Playground - Emma Prusch
New Construction
Post-Bid
$2,250,001 to $2,750,000 est. value
San Jose, CA

Hatch Preschool Playground Project
New Construction
Post-Bid
Half Moon Bay, CA 94019

Tahoe Park Pool Restroom Renovation
Renovation, Infrastructure
Results
$220,570 est. value
Sacramento, CA 95820

Creekside and Meadowbrook Group Area Renovation at Vasona Lake County Park
Renovation
Results
$924,206 est. value
Los Gatos, CA 95032

The Landing at Arroyo and Vintage at Sycamore
New Construction
Construction
$114,000,000 est. value
Simi Valley, CA 93065

Traditions at the Meadow Subdivision
New Construction - 7,500 SF
Pending Verification
$1,000,000 est. value
Martinez, CA 94553

The Creek at Dominguez Hills
New Construction - 199,000 SF
Conception
$10,000,000 CJ est. value
Carson, CA 90746

Icon/Echo Towers
New Construction, Demolition - 478,500 SF
Design
$600,000,000 est. value
San Jose, CA 95113

Contract to Install - Poured in Place Surfacing
Renovation
Bidding
Salinas, CA 93901

Last Updated 11/24/2021 02:34 PM
Project Title

Construction of Improvements at the Irish Town Green Park

Physical Address View project details and contacts
City, State (County) South San Francisco, CA 94080   (San Mateo County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the construction of improvements at the Irish Town Green park including installation of Granitecrete patio and paths, new concrete bench pads, new split rail fence, new chain link fence fabric replacement, new chain link gate, and minor fence and gate repair. The project is located within the Irish Town Green space at the intersection of Armour Avenue and Airport Boulevard in South San Francisco, CA.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents