Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Downtown Lot Improvements - City of Cedar Falls
Infrastructure
Conception
$300,000 CJ est. value
Cedar Falls, IA 50613

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Residence Inn by Marriott / Cedar Falls
New Construction, Infrastructure - 21,530 SF
Design
$6,500,000 CJ est. value
Cedar Falls, IA 50613

India Heritage & Cultural Center
New Construction, Infrastructure - 20,000 SF
Bidding
$3,976,023 CJ est. value
Madrid, IA 50156

HMA Resurfacing - U.S. 20, Iowa 27
Infrastructure
Bidding
$1,500,000 CJ est. value
Waterloo, IA 50701

Buchanan County Health Center Inpatient Addition and Renovation Project - RFQ/RFP Subcontractors
Addition, Demolition, New Construction, Renovation, Infrastructure
Sub-Bidding
$16,500,000 CJ est. value
Independence, IA 50644

Independence Light & Power Telecommunications Ind. Building Improvements
Renovation, Demolition - 3,420 SF
Post-Bid
Independence, IA 50644

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

Cedar Falls West Viking Road Industrial Park Phase V
Addition, Infrastructure - 180,675 SF
Results
Cedar Falls, IA 50613

2022 Road Program
Infrastructure
Results
$289,643 CJ est. value
Boone, IA 50036

City Park - City of Alta
Infrastructure, Renovation
Pending Verification
$475,600 CJ est. value
Alta, IA 51002

Gibson Property Development - Phase lll-V - City of Cedar Falls
New Construction, Infrastructure
Pending Verification
$1,400,000 CJ est. value
Cedar Falls, IA 50613

Gibson Property Development - Phase I - 2 - City of Cedar Falls
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Cedar Falls, IA 50613

Tiger Performance Center - Cedar Falls Community Schools
New Construction, Infrastructure - 85,500 SF
Design
$9,000,000 CJ est. value
Cedar Falls, IA 50613

Last Updated 05/25/2023 09:15 AM
Project Title

Winterset New Environmental Center And Headquarters

Physical Address View project details and contacts
City, State (County) Winterset, IA 50273   (Madison County)
Category(s) Commercial, Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Office, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Environmental Center And Headquarters At Pammel Park. The Center itself is intended as headquarters for the Madison County Conservation Board and all that exceptional system involves – public nature education, one-of-a-kind outdoor experiences and lasting memories. Few other systems within Iowa or the region hold MCCB’s track record for delivering vitally needed education and attracting the public to the outdoors. As of July 26, 2019, this project is still in the design and funding stage. However, information regarding design firm on board has not been disclosed. A construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. As of May 25, 2023, no new information available

Details

12,400 SF.
Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents