Similar Projects
Sealcoating and Striping Parking Lots
Infrastructure
Bidding
$300,000 est. value
Greenfield Center, Middle Grove, Saratoga Springs, NY 12850

Paving of Certain Village Streets
Post-Bid
Waterford, NY

Sealcoating/Crack Sealing/Striping 2021
Infrastructure
Post-Bid
Stillwater, NY

Paver Placed Surface Treatment
Term Contract
Results
Ballston Spa, NY 12020

Pavement Corrective Maintenance with Guide Rail and Sidewalk Work
Results

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Old Post Road and Route 9 Intersection Improvement Project
Results
Malta, NY

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Hudson-Mohawk Trail Resurfacing Improvements
Infrastructure
Results
$765,300 to $1,035,400 est. value
Saratoga Springs, NY

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Crack Seal/Mastic
Infrastructure
Results
Clifton Park, NY

Administration Mortar Joint Repairs
Infrastructure
Post-Bid
$100,000 est. value
Saratoga Springs, NY 12866

Adirondack Day Hab Parking Lot Repave and Restripe with Lighting Upgrade
Infrastructure
Results
$750,000 to $775,000 est. value
Corinth, NY 12822

2022 Saratoga County Paving Projects
Infrastructure
Post-Bid
$300,000 est. value
Ballston Spa, NY

Pavement Resurfacing, I-87 From Exit 15 to Exit 16
Infrastructure
Results
$4,300,000 est. value
NY

Last Updated 06/21/2022 12:06 AM
Project Title

Chips Paving Program 2022

Physical Address View project details and contacts
City, State (County) Round Lake, NY   (Saratoga County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Alternate #1: The contractor is to include the work shown on DWG MST-11 & MST-12. The award will be based on the following: - The price of Base Bid plus Alternate #1 will be used to determine the low bidder; however, - If the total price for the Base Bid plus Alternate #1 exceeds the total budgeted amount, then the Base Bid will be used to determine the low bidder and will be the basis of the award.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents