Similar Projects
Eastman Road Apartments
New Construction
Conception
Longview, TX

Spring Park Estates Addition
New Construction
Conception
$8,000,000 est. value
Arlington, TX 76016

Paloma Village
New Construction - 445,296 SF
Design
$10,000,000 CJ est. value
Fort Worth, TX 76177

Shepherd Place Development
New Construction
Design
Sherman, TX 75092

Wilshire Park Renovation
Infrastructure
Bidding
$1,800,000 CJ est. value
Euless, TX 76040

FM 1785 - Widen Road - Add Shoulders
Infrastructure
Bidding
$3,266,876 CJ est. value
Big Spring, TX 79720

Traffic Signal Improvements
Infrastructure
Sub-Bidding
$125,823 CJ est. value
Corpus Christi, TX 78406

IH0035 - Installation of Flashing Beacons and Ped
Infrastructure
Sub-Bidding
$2,925,000 CJ est. value
San Antonio, TX 78208

The Heritage at Creek Valley Senior Living
New Construction - 132,000 SF
Post-Bid
$10,000,000 CJ est. value
Carrollton, TX 75010

Construction and Permanent Financing J.C. Machuca Apartments 144 Units
Post-Bid
Less than $26,000,000 est. value
El Paso, TX

Land Clearing Of 80 Acres
Results
Less than $307,800 est. value
Cleveland, TX 77327

Bryan Midtown Park Phase 2 - Bigshots Access Drive
Results
$1,012,000 est. value
Bryan, TX 77803

Rosedale Apartments
New Construction
Construction
Fort Worth, TX 76104

The Carter Development
New Construction
Construction
Grapevine, TX 76051

Tejas Cove Apartments
New Construction - 276,304 SF
Pending Verification
$10,000,000 CJ est. value
Bay City, TX 77414

Last Updated 07/29/2022 03:08 PM
Project Title

Bluestem - Hardscape and Landscape Improvements

Physical Address View project details and contacts
City, State (County) Aurora, TX 76078   (Wise County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Site Development to include Sidewalk, Fencing, Electrical Restroom Building, Plumbing, Playground Equipment, Pool Deck, Entry Monument, Railing, Columns, Site Furnishings, Landscape, Irrigation, Masonry, Stuctural Steel, Painting, Aluminum Beams, Metal Roof, Signage

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures, Temporary Fencing.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Steel Framing, Fabricated Fireproofed Steel Columns, Structural Aluminum Framing, Steel Decking, Metal Railings.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers, Roof Tiles, Metal Roof Tiles.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Sidewalk Lifts.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Exterior Lighting, Landscape Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents