Similar Projects
Route 82 Safety Improvement Phase 2 - Connecticut Department of Transportation
Infrastructure
Conception
$20,400,000 CJ est. value
Norwich, CT 06360

Route 82 Safety Improvement Phase 2 - Connecticut Department of Transportation
Infrastructure
Conception
$20,400,000 CJ est. value
Norwich, CT 06360

National Coast Guard Museum
New Construction, Infrastructure - 80,000 SF
Design
$100,000,000 CJ est. value
New London, CT 06320

National Coast Guard Museum
New Construction, Infrastructure - 80,000 SF
Design
$100,000,000 CJ est. value
New London, CT 06320

New London Community Recreational Center
New Construction, Infrastructure - 57,000 SF
Bidding
$15,000,000 CJ est. value
New London, CT 06320

Conversion of Griswold Senior Center to Griswold Alternative Education
Demolition, New Construction, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Griswold, CT 06351

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

National Coast Guard Museum (NCGM) - Bulkhead and Fill
Infrastructure
Post-Bid
$1,000,000 CJ est. value
New London, CT 06320

USCG Academy Overlay Track Surface
Term Contract
Results
$500,000 to $1,000,000 est. value
New London, CT 06320

Replacement of Sherman Street Bridges over the Yantic River
Renovation, Infrastructure
Results
Norwich, CT

The Great Wolf Lodge at Mashantucket
Demolition, New Construction, Infrastructure - 90,000 SF
Construction
$300,000,000 CJ est. value
Ledyard, CT 06338

The Great Wolf Lodge at Mashantucket
Demolition, New Construction, Infrastructure - 90,000 SF
Construction
$300,000,000 CJ est. value
Ledyard, CT 06338

Oswegatchie Hills Affordable Housing
New Construction, Infrastructure
Pending Verification
$317,000,000 CJ est. value
East Lyme, CT 06333

Parking Lot - New London Board of Education
Infrastructure
Pending Verification
$500,000 CJ est. value
New London, CT 06320

Route 82 Safety Improvement Phase 1 - from Banas Court to Fairmont Street, City of Norwich - Connecticut Department of Transportation
Infrastructure
Conception
$20,000,000 CJ est. value
Norwich, CT 06360

Last Updated 04/26/2023 10:26 AM
Project Title

I-95 Interchange 74 Improvements at Route 161 and Replacement of Bridge No. 00250

Physical Address View project details and contacts
City, State (County) East Lyme, CT 06333   (New London County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction Commenced, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $148,299,008 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

*As of April 26, project construction has already commenced. Construction just started this month April 2023. State Project Number(s) & Description: Project No. 44-156; I-95 Interchange Improvements at Route 161 and Replacement of Bridge No. 00250 in the Town of East Lyme. Required Prequalification Work Classification(s): Group No. 7 Road Construction and Rehabilitation: Limited Access Highways and Freeways Federal-aid Project Number(s) & Funding Source: FHWA (F.A.P. No. 0953(078) Pre-Bid Conference and/or Site Visit Information: N/A District Number(s) : 2 - Norwich Contract DBE % Goal or SBE % Set-Aside: DBE 13% Project Scope Code: P - $ 120,000,000 - $ 159,999,999 Completion Date : 976 Calendar Days Liquidated Damages Rate: 8,900.00 Days DBE Submittal Requirements - The two (2) lowest bidder's DBE Commitment Approval Request form(s) meeting the established DBE contract goal percentage or Good Faith Effort (GFE) Application Request including all "backup" documentation, as applicable, are due to the Department no later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the DBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. SBE Submittal Requirements - The low bidder's SBE Commitment Approval Request form(s) meeting the established SBE set-aside percentage or Request for Waiver application are due to the Department no 736later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the SBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. Prequalification Requirements: Prospective bidders must be prequalified with the Department of Transportation and have on file a sworn Statement (CON 16) by the time of the bid. In order to help ensure that prospective bidders may become prequalified in time for the bid opening for a given contract, contractors should be certain to return the Prequalification Application (CON 16) with all necessary information, signatures and notarized documents, to the DOT Contracts Unit at least thirty (30) calendar days before requesting a bid proposal form for that contract. Bid Proposal Forms: All prospective bidders requesting to obtain the official Bid Proposal Form must submit a completed Bid Proposal Request Form (Part C) to the DOT Contracts Unit per the above instructions. If the Bid Proposal Request Form (Part C) and the Contractor Prequalification Application are found to be satisfactory, the bidder will receive an email response from the Department instructing the bidder to download the electronic Bid Proposal Form Bid Bond Security: Except when otherwise specified in the bid documents, no proposal will be considered unless; (a) it is accompanied by a proposal guaranty from a surety company in the form of the Department s (CTDOT) standard bid bond form furnished by the Department, as may be revised, satisfactory to the Commissioner, in an amount equal to at least 30% of the amount of the bid; or (b) the bidder has on file in the Contract Section a current Department (CTDOT) standard annual bid bond form, satisfactory to the Commissioner, on the form furnished by the Department. DOT encourages bidders to file an Annual Bid Bond with the Department so that the bidder does not have to submit a bid bond each time they bid on a specific project/proposal. At the time of the bid opening, the surety must be a corporate surety licensed by the Insurance Commissioner of the State of Connecticut and must hold a Certificate of Authority as an acceptable Surety and/or Reinsuring Company acceptable to the Federal Department of Treasury. The surety's underwriting limitation must not be less than the full amount required by the bond itself. Pre-Bid Questions and Answers: Questions pertaining to DOT advertised construction projects must be presented through the CTDOT Pre-Bid Q and A Website. The Department cannot guarantee that all questions will be answered prior to the bid date. Please Note - at 9:00 am Monday (i.e. typical Wednesday Bid Opening) the project(s) being bid will be closed for questions, at which time questions can no longer be submitted through the Q and A Website. Answers may be provided by the Department up to 12:00 noon, the day before the bid. At this time, the Q and A for those projects will be considered final, unless otherwise stated and/or the bid is postponed to a future date and time to allow for further questions and answers to be posted. If a question needs to be asked the day before the bid date, please contact the Contracts Unit staff and email your question to dotcontracts@ct.gov immediately. Prevailing Wage Rates: The minimum rates to be paid labor of the various classifications shall be in accordance with current schedule of wages established by the State Labor Commissioner as provided in the Connecticut General Statutes, as revised. The Contract Wage Certification Form is to be submitted to the Labor Commissioner before the award of the contract. The Department, prior to the awarding of any contract, may require further financial and other information from any applicant who becomes the low bidder for that contract. The Commissioner of Transportation reserves the right to reject any and all bids. CTDOT - I-95 Interchange Improvements at Route 161 and Replacement of Bridge Number 00250 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents