Similar Projects
Bridge Thin Deck Overlay - US 40
Infrastructure
Conception
$266,494 CJ est. value
Cloverdale, IN 46120

Bridge Thin Deck Overlay - US 40
Infrastructure
Conception
$266,494 CJ est. value
Cloverdale, IN 46120

Small Structures and Drains Construction - US 231
Infrastructure
Design
$794,335 CJ est. value
Greencastle, IN 46135

Small Structures and Drains Construction - US 231
Infrastructure
Design
$794,335 CJ est. value
Greencastle, IN 46135

Community Crossings Paving Program
Infrastructure
Bidding
$600,000 CJ est. value
Cloverdale, IN 46120

Community Crossings Paving Program
Infrastructure
Bidding
$600,000 CJ est. value
Cloverdale, IN 46120

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021-2 CCMG Street and Sidewalk Improvements
Infrastructure
Results
Roachdale, IN 46172

IDIQ, Pavement Patching
Infrastructure
Results
Greencastle, IN 46135

Ferguson Lumber
New Construction, Infrastructure - 11,908 SF
Construction
$3,000,000 CJ est. value
Coatesville, IN 46121

Town of Cloverdale 2023-1 CCMG
Infrastructure
Bidding
$750,000 CJ est. value
Cloverdale, IN 46120

Water System Improvement
Infrastructure
Post-Bid
Russellville, IN

Institution and Park Road Maintenance
Infrastructure
Results
$3,000,000 est. value
Greencastle, IN 46135

Resurfacing Roads
Infrastructure
Post-Bid
Greencastle, IN

Last Updated 06/14/2023 08:05 AM
Project Title

Water Utility Improvements - Division "B" Distribution System Improvements

Physical Address View project details and contacts
City, State (County) Reelsville, IN 46171   (Putnam County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,299,707 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 7, 2023 the engineer has issued a recommendation of award to The Reelsville Water Authority, however, the project has not been officially awarded. The earliest the project is expected to be awarded the end of March 2023. The Project includes the following Work: Division "B" Distribution System Improvements The project includes but is not limited to the installation of approximately 7,600 ft of 4-inch water main and 3,000 ft of 6-inch water main and the installation of a pressure reducing valve bypass. The work includes associated excavation, paving, grading, surface restoration, utility relocation to accommodate the proposed improvements, and all work required to complete the project as outlined in the Plans and Specifications. Division "C" Administrative Office and Storage Building The project includes but is not limited to the construction of a new 2,550 sq. ft. pre-engineered metal storage building and the construction of an addition to an existing building. The work includes associated excavation, paving, grading, surface restoration, and all work required to complete the project as outlined in the Plans and Specifications. Separate Bids will be received for the following Contracts: Division "B" - Distribution System Improvements; Division "C" - Administrative Office and Storage Building. Bids will be received for a single prime Contract per division of work. Additional questions concerning access to the website may be directed to Commonwealth Engineers, Inc. at (317)+888-1177. All addenda, which may be issued for this Project, will be issued to each plan holder via email. For those who also purchase printed Contract Documents, printed addenda will be provided as well. All plan holders shall note, the printed documents are provided as a courtesy and do not preclude the plan holder from relying upon the web/email based materials (i.e. delays in mail delivery will not be considered relevant due to all contract document holders access to materials via web/email). No refunds will be issued for this project. The OWNER reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. NO bid may be withdrawn after the scheduled closing time for receipt of bids for at least 90 days. Bid security shall be furnished in accordance with the Instructions to Bidders.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents