Similar Projects
Wells 6 and 8 Water Treatment Plant Expansion
Addition, Infrastructure
Bidding
$6,800,000 est. value
Anoka, MN

Supernatant Pump and Provide Training
Post-Bid
Minneapolis, MN

Hill Annex Observation Well Drilling
Post-Bid
$368,000 est. value
Calumet, Marble, MN

Municipal Well No. 5 & DNR Compliance (Monitoring) Well
Results
Carver, MN

Capping the West Well
Results
Rochester, MN 55906

Horse Camp Well Pump Replacement
Post-Bid
Spring Valley, MN 55975

By-Pass Pumping
Results
Minneapolis, MN

Mystery Cave State Park - Well Pump
Renovation
Post-Bid
Spring Valley, MN 55975

WWTF Pump and Diffuser Improvements
Results
Less than $1,750,000 est. value
New Ulm, MN

Sump Pump Replacement at MCF - Moose Lake
Post-Bid
Moose Lake, MN

High Service Pump 4 & Backwash Pump 11 Rehabilitation
Results
$105,000 est. value
Lakeville, MN

Gilfillan Lake WMA Obervation Well Drilling
New Construction
Post-Bid
North Oaks, MN 55127

Wells 10 & 12 Rehabilitation
Results
$160,000 est. value
Lakeville, MN 55044

Como Regional Park Observation Well Drill
Infrastructure
Post-Bid
Saint Paul, MN 55118

Sewer Pump Replacement
Renovation
Results
Bemidji, MN 56601

Last Updated 01/20/2022 02:46 PM
Project Title

Knowlton Creek and Scanlon Grating Replacement

Physical Address View project details and contacts
City, State (County) Duluth, MN   (Saint Louis County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes removal, replacement and reconstruction of the grating, structural beams and connections at the Knowlton Creek and Scanlon pump station wet wells. The work includes providing and installation of guard rails, safety tie-off points and davit bases.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents