Similar Projects
Living Word Fellowship Townhomes
New Construction
Conception
Winston-Salem, NC 27106

450 Polo Road
New Construction
Conception
Winston-Salem, NC 27105

Old Mill Subdivision
New Construction
Design
Clemmons, NC 27012

Metropolitan Village
New Construction - 39,810 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Winston-Salem, NC 27101

Winston-Salem Choice Neighborhood Initiative
New Construction
Post-Bid
Winston Salem, NC

Ardmore Commons
New Construction
Construction
Winston-Salem, NC 27103

Winston-Salem CNI Phase 1
New Construction - 77,917 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Winston-Salem, NC 27101

Redwood Apartments Winston Salem
New Construction
Pending Verification
Winston-Salem, NC 27114

Wooten Farm Residential Development
New Construction
Design
$65,400,000 est. value
Winston-Salem, NC 27114

Murray Heights
New Construction - 3,213,210 SF
Design
Winston-Salem, NC 27106

Villas at Grandview
New Construction - 855,965 SF
Design
$10,000,000 CJ est. value
Pfafftown, NC 27040

Harvest Creek
New Construction
Design
Winston-Salem, NC 27107

Vest Mill Apartments
New Construction - 1,404,118 SF
Design
$10,000,000 CJ est. value
Winston-Salem, NC 27103

Salemtowne Retirement Community - Phase 4
New Construction, Renovation, Addition - 242,500 SF
Design
Winston-Salem, NC 27106

Harper's Landing
New Construction
Design
Winston-Salem, NC 27114

Last Updated 07/05/2022 02:19 PM
Project Title

Liberty Street Apartments

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC 27101   (Forsyth County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Parking Garage
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected October 2023
Bids Due View project details and contacts
Estimated Value $103,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope details have not been released. As of July 1, 2022 the project is in planning stage. The general contractor has not been chosen. Information regarding the architect and method of general contractor selection has not been disclosed. Construction is planned to begin in the later half of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Absolutely no inquiries will be accepted at this time. Unsolicited inquiries may result in disqualification in any future bidding opportunities

Details

Multi-Family Homes, to 1 Story Above Grade, New Construction, 275, Parking Garage, to 5 Stories Above Grade, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents