Similar Projects
Clarifier Rehabilitation
Renovation
Bidding
Wanaque, NJ 07465

Clarifier Improvements
Post-Bid
Parsippany, NJ 07054

Removal of 8,500 LBS of Non-Hazardous Spent Carbon and Installation of 8,500 LBS of GC C-40 Pelletized Carbon
Post-Bid
Lawrenceville, NJ 08648

Tertiary Treatment Project
Results
Budd Lake, NJ 07828

River Road WWTP Modified Aeration Clarifier No. 2 Improvements Project
Results
$164,430 est. value
Princeton, NJ 08540

Substation M and Headworks Reconstruction
Renovation
Construction
Newark, NJ 07105

Wastewater Treatment Plant Rehabilitation
Construction
Elwood, NJ 08217

2021 Maintenance Contract - Sewer Treatment Plant
Post-Bid
Palmyra, NJ 08065

River Road STP Multiple Hearth Incinerator No.2 Repairs
Results
$108,738 est. value
Princeton, NJ 08540

Sludge Hauling Services Woodland and Butterworth Sewage Treatment Plants
Post-Bid
Convent Station, NJ 07960

Helen Fort Waste Water Treatment Plant Project
Results
Pemberton, NJ 08068

Furnishing and Delivery of Acqueous Calcium Nitrate and Twice Yearly System Maintenance
Post-Bid
Oakhurst, NJ

Elmwood WWTP Filter Replacement
Results
Marlton, NJ 08053

Odor Control Systems Service
Post-Bid
Pennsauken, NJ

Odor and Corrosion Control, Boxide
Results
$4,190 est. value
Aberdeen, NJ 07747

Last Updated 12/28/2021 09:21 AM
Project Title

Stage V - Miscellaneous Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) NJ   (Somerset County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $974,118
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work required under the Contract shall consist of, but is not limited to, site preparation, transportation, delivery, bypass pumping, removal of existing grinder at the influent pump station and installation of new climber screen with washer compactor, installation of new MCC enclosure at the influent pump station, removal and installation of oxidation ditch outlet control and installation of perimeter fencing, replacement of hand railings at O2 ditch rotor access walkways and outlet control structure, yard hydrant replacement, valve replacements at blower shed and post aeration basin, telescopic valve and plug valve replacements; sludge pit modifications, and site plug valve replacements at each final clarifier, new paved roadway to influent pump station, electrical work, start-up, testing, warrantees, guarantees, training and other work incidental to the full completion of the project. The influent pump station and WWTP operations are to be maintained 24/7 throughout the construction of the project.

Details

1 Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 26 - Electrical, Lighting.
Division 33 - Utilities, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents