Similar Projects
Beach Access - Boardwalk Rejuvenation
Results
Less than $125,000 est. value
FL

Robiner Park Pathway and Kayak Launch
Infrastructure
Post-Bid
$300,000 est. value
Royal Palm Beach, FL 33411

Lake Park Marina Dock Repairs
Alteration
Results
Lake Park, FL 33403

Lake Park Harbor Marina Piling Replacement
Results
Lake Park, FL 33403

Ocean Inlet Park - Marina Replacement
Results
Lake Worth, FL 33460

Pavilion Lake Piers, Docks and Gangways
Results
Belle Glade, FL 33430

Harvey E. Oyer Jr. Park Marina Boat Ramp Improvement Project
Bidding
$1,200,000 est. value
Boynton Beach, FL 33435

Y--BLM-ES-ONA Boardwalk Repairs
Alteration
Post-Bid
$25,000 est. value
Hobe Sound, Jupiter, FL 33469

John Prince Park - Boat Ramps Replacement
Term Contract
Results
Less than $770,000 est. value
Lake Worth, FL 33461

Peanut Island - Boardwalk Repairs
Term Contract
Results
Less than $100,000 est. value
West Palm Beach, FL 33411

Inshore Annual Construction (Federalized)
Results
Palm Beach Gardens, FL 33408

Dock Demolition at the Jupiter Inlet Lighthouse Outstanding Natural Area
Post-Bid
Jupiter, FL

Corbett Boardwalk Phase 1
Results
Less than $501,000 est. value
West Palm Beach, FL 33412

Dune Crossover Renovations, Phase IV
Results
Less than $925,000 est. value
Jupiter, FL

Boynton Harbor Marina Fuel Dock Marina Slips Management Services
Infrastructure
Results
Boynton Beach, FL 33435

Last Updated 08/30/2021 03:02 AM
Project Title

Dune Crossover Renovations, Phase V

Physical Address View project details and contacts
City, State (County) Jupiter, FL   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $330,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of but is not limited to the demolition of existing dune crossover structures, excavation to facilitate demolition and installation of dune crossovers, pile driving, rough carpentry, aluminum handrail installation, beach fill installation, and concrete placement.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents