Similar Projects
Lakeview Centennial High School HVAC Ductwork Replacement
Bidding
$550,000 est. value
Garland, TX 75043

HVAC Air Handling Units Replacements
Bidding
Dallas, TX

Replacement Exhaust Systems at New Baker and New Hampton Pump Stations
Post-Bid
Dallas, TX 75201

Heat Exchanger Replacement
Post-Bid
Irving, TX 75062

Dedicated Outside Air Units
Results
$320,420 est. value
Mesquite, TX

HVAC Refurbishing Fire Admin Building
Results
Irving, TX

Addison Airport Toll Tunnel Exhaust Fan Replacement
Bidding
Addison, TX

Fire Station Vehicle Exhaust Removal and Filtration System
Post-Bid
Addison, TX 75001

65--Steam Sterilizers - Removal, Installation and Maintenance Sources Sought Notice
Results
Dallas, TX

Roofing Services and HVAC Upgrades Summer 2020
Post-Bid
Mesquite, TX 75149

HVAC Replacement at 2422 Butler Street
Results
Dallas, TX 75235

HVAC Compressor and Ducting Replacement
Post-Bid
Irving, TX 75062

MLP8 HVAC and BMS Upgrade
Results
$296,830 est. value
Dallas, TX 75287

FY20 HVAC Maintenance and Service
Term Contract
Post-Bid
Arlington, Bonham, Carrollton, Cleburne, Corsicana, Dallas, Decatur, Denton, Duncanville, Ennis, Fort Worth, Granbury, Grand Prairie, Greenville, Hurst, Irving, Kaufman, Lake Worth, Lewisville, McKinney, Mesquite, Mineral Wells, North Richland Hills, Plano, Richardson, Sherman, Stephenville, Terrell, Watauga, Waxahachie, Weatherford, TX 76103

Replacement of Self-Contained Air Handling Unit and Heat Exchanger at Pump Station 13
Results
Dallas, TX 75212

Reported 02/29/2020 12:00 AM
Project Title

Cedar Valley Commercial HVAC Renovation

Physical Address View project details and contacts
City, State (County) Lancaster, TX 75134   (Dallas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $2,800,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of approx. 12,877 sf of the existing HVAC training lab and classroom areas. The work will consist of two phases; 1. Phase 1 will begin immediately after NTP from the owner and will consist of Architectural, Mechanical, Electrical, and Plumbing scope of work in 3 existing classrooms, one conference room, and one-half of the training lab. Phase 1 will continue with Phase 2 timeline. 2. Phase 2 will begin after May classes conclude and will consist of Architectural, Mechanical, Electrical, and Plumbing scope of work in 2 existing classrooms, the other half of the training lab, and a few adjacent spaces. Phase 1 continues with phase 2 timeline. Both phases are required to complete prior August 2020 class commencement.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents