Similar Projects
Re-Roofing the Edgefield County Library
Post-Bid
Edgefield, SC

Polly Best Center Roof Replacement
Post-Bid
Less than $110,000 est. value
Barnwell, SC 29812

New Roof on Training Building
Results
Less than $27,950 est. value
Gaffney, SC 29340

Roofing Job
Results
$50,000 to $60,000 est. value
Cheraw, SC

BPH Roofing and Siding Repairs
Term Contract
Post-Bid
Columbia, SC

Admin Roof Replacement - John de la Howe School
Results
$400,000 to $500,000 est. value
McCormick, SC 29835

Brookland Lakeview Empowerment Center - CDBG Roof Replacement Project
Post-Bid
West Columbia, SC

Catawba Service Unit Roof Replacement
Results
$250,000 to $500,000 est. value
Rock Hill, SC 29730

Marion County Roofing Project for the Beeson Building
Post-Bid
Marion, SC 29571

St. James Elementary School (SJES) Roof Repair
Term Contract
Results
Myrtle Beach, SC

Roof Replacement
Post-Bid
Winnsboro, SC 29180

Z--Replace Roof-Historic LLS QTRS Building
Results
$50,000 to $100,000 est. value
Sullivan's Island, SC 29482

Roofing Supplies
Post-Bid
Columbia, SC

USC Aiken Etherredge Center Roof Repair
Results
$95,000 to $110,000 est. value
Aiken, SC

Basic Science Building Exterior Envelope Repairs - Roof
Post-Bid
$1,500,000 to $2,000,000 est. value
Charleston, SC 29425

Reported 12/21/2019 12:00 AM
Project Title

Water Plant 4 Pump Station Roof Replacement

Physical Address View project details and contacts
City, State (County) Sumter, SC 29151   (Sumter County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Removal and Replacement of Pump Station Roof at Water Plant 4 1. Complete tear off to existing deck. 2. Remove flashing from the walls. 3. Remove scuppers, downspouts, and heads. 4. Dispose of all trash, debris, and old roof materials. 5. Install 1 Vz" continuous insulation attached to deck. Tapered insulation is acceptable where needed to achieve adequate slope for positive drainage. 5. Install new tapered crickets between scuppers. 6. Install a 60 mil TPO roofmembrane fastened per manufacturer's specifications. 7. Install TPO flashing up and over top ofwalls. 8. Install TPO coated metal scuppers 9. Install wood nailers on top ofwalls 10.Install 24 gage coping cap at walls. Color will be selected by owner. 11.Install new heads and down spouts. 12.Furnish a certified 20 year manufacturer's warranty and a minimum 2 year workmanship warranty.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents