Similar Projects
Macallister Place
New Construction
Conception
Leawood, KS 66224

Harper Street Housing Project
New Construction - 24,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Lawrence, KS 66044

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Ulysses Airport - Rehabilitate Runway 17-35
Infrastructure
Bidding
$500,000 CJ est. value
Ulysses, KS 67880

Reconstruct Roads, Signage Improvements and Gate Fort Scott National Cemetery
Infrastructure
Bidding
$1,000,000 CJ est. value
Fort Scott, KS 66701

Andover Fire Station #2 - Bid Package #1
New Construction, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Andover, KS 67002

Great Bend Police Station and Court Facility
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Great Bend, KS 67530

Valvoline Instant Oil Change / Lawrence
Demolition, New Construction, Infrastructure - 2,025 SF
Post-Bid
$1,100,000 CJ est. value
Lawrence, KS 66046

Farmers' Market Pavilion Site
Infrastructure
Results
Overland Park, KS

Grading and Surfacing. 230th Ave Fr i-70 To Feedlot Rd And Feedlot Rd Fr 230th Ave To Us-183 In El Co. Lgth Is 3.37 m.
Infrastructure
Results
KS

Bristol Highlands North Single Family Homes
New Construction
Construction
Shawnee, KS 66218

Chick-Fil-A - Galleria 115 / Overland Park
New Construction, Infrastructure - 4,989 SF
Construction
$1,500,000 CJ est. value
Overland Park, KS 66211

Residential Living in Kansas
New Construction
Pending Verification
Shawnee, KS

Santee Residential Development
New Construction
Pending Verification
Lawrence, KS

Last Updated 08/22/2022 09:31 AM
Project Title

2022 CFP Sitework Improvements at Scattered Sites

Physical Address View project details and contacts
City, State (County) Howard, KS 67349   (Elk County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $41,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Howard Housing Authority (HHA) is seeking Proposals from qualified firms to provide all labor and materials for the Sitework Improvements at Sites A and C in Howard, KS. The general scope of work includes removal of the existing concrete walks and ramps, base preparation and replacement as shown with new concrete walks and ramps with rails, and other items as specified for a complete and working installation. Any questions regarding the RFP should be directed to Richard Zingre, Project Architect at Zingre and Associates, PA. rzingre@gmail.com or 620-223-6030 voice. The general scope includes (1) demolition of selected concrete pavement and steel railings (2) Preparation and compaction of the subgrade. (3) Placement of new concrete walks and ramps, installation of steel handrails, joint sealing, etc. (4) Yard repairs, finish grading and seeding of damaged areas in the work zone 100% performance and payment bonds The Housing Authority reserves the right to reject any or all proposals and to award the contract in the best interest of the Authority. Cost estimate: $25,000-$30,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents