Last Updated 04/30/2021 09:45 AM
Project Title

2021 Construction of the Croft Farm Trail Improvements

Physical Address View project details and contacts
City, State (County) Cherry Hill, NJ 08003   (Camden County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project proposes the installation of approximately 800 square yards of a 6’ wide, 3” thick HMA pedestrian path from the Bortons Mill Trail system to the existing Croft Farm pedestrian path and trail system along Bortons Mill Road. The project also includes concrete ADA ramp improvements, tree removal and replacement, traffic control signage and traffic striping.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents