Similar Projects
HVAC Renovation, Building 22
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Columbia, SC 29209

Chiller Equipment Maintenance
Term Contract
Sub-Bidding
Columbia, SC 29201

Mills/Jarrett - Replace 2 Rooftop Units
Alteration
Post-Bid
$300,000 to $480,000 est. value
Columbia, SC 29201

Asgdc`S Fire, Security and HVAC Maintenance Control Services
Alteration
Post-Bid
Columbia, SC

Bryan/Morris Village Cooling Tower Piping Replacement
Results
$1,300,000 to $1,500,000 est. value
Columbia, SC 29203

BSC Chiller Replacement
Alteration
Results
$250,000 to $300,000 est. value
Columbia, SC 29205

HVAC Filters for University of South Carolina System-Wide
Alteration
Post-Bid
Columbia, SC

Recreation HVAC
Alteration
Results
$89,933 est. value
Columbia, SC 29223

Air Handler and Condensing Unit
Alteration
Post-Bid
Columbia, SC 29229

Remove and Replace 40T Chiller With Trane or Equivalent
Alteration
Results
Columbia, SC

HVAC Services as Needed for Bonneau and Stephen Facilities
Alteration
Post-Bid
Columbia, SC

Hayne Lab - Install HVAC Rooms 112 and 208
Alteration
Results
$25,000 to $35,000 est. value
Columbia, SC 29223

C.Lem Harper Building - Auditorium HVAC Unit Renovation
Alteration
Post-Bid
$100,000 to $200,000 est. value
Columbia, SC 29201

Air Handler and Heat Pump (15 Ton)
Alteration
Results
Columbia, SC

Midlands Center - Dental Clinic - HVAC Replacement
Alteration
Post-Bid
$10,000 to $20,000 est. value
Columbia, SC 29203

Last Updated 12/13/2022 05:05 PM
Project Title

Birchwood High School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $470,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid includes the removal and replacement of (4) packaged rooftop units with new as shown in the bid documents. Provide alternate pricing to replace (4) units as noted on the floor plans (AHD/HPD-7, 8, 9, & 11) separately from the based bid. Provide unit pricing to replace (1) existing classroom split heat pump unit with new ductless mini-splits as shown. Unit prices shall be based on a per occurrence to install or modify a whole functional system. Bid Security is Required in an Amount Not Less Than 5% of the Base Bid. The successful Contactor will be required to provide Performance and Labor and Material Payment Bonds, each in the amount of 100% of the Contract Price. All questions & correspondence concerning this Invitation shall be addressed to the A/E. Mechanical Design, Inc. Justin Varco justin@mdi9834.com 803-731-9834 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents