Similar Projects
Repair Of Sewage Lift Station
Term Contract
Bidding
Montgomery, AL 36108

2020 PS03 Pump Station Upgrades
Renovation, Infrastructure
Bidding
$3,500,000 est. value
Birmingham, Brighton, AL 35203

Bypass Pump Installation - Uniroyal Lift Station
Post-Bid
Opelika, AL 36801

Clements Road Water Booster Station Improvements Project
Post-Bid
Tuscaloosa, AL

2019 CDBG Sewer Improvements
Results
Less than $229,030 est. value
Chatom, AL 36518

Baltzell Lift Station Elimination
Results
Anniston, AL 36202

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Sanitary Sewer System - Asset Management Program - Pump Station Upgrades
Renovation, Infrastructure
Bidding
$3,500,000 est. value
Birmingham, AL

Bob Jones Lift Station 2021 Improvements (Contract B)
Post-Bid
Scottsboro, AL

Repair Lift Station And Oil Water Separators
Results
$500,000 to $1,000,000 est. value
Montgomery, AL 36108

Contract A: Install a Booster Pump Station
New Construction
Bidding
Grant, AL

Campus Area Water Distribution System and Instrumentation Upgrades - Proposal "C" Project
Post-Bid
Tuscaloosa, AL

Lift Station 1 and 2 Rehabilitation
Results
Less than $900,000 est. value
Dadeville, AL

6th Street Lift Station Improvements
Renovation
Bidding
Muscle Shoals, AL

Proposed Booster Pump Station & Water Line Improvements
New Construction
Post-Bid
$1,500,000 est. value
Smiths Station, AL

Reported 02/25/2022 12:00 AM
Project Title

2021 Sanitary Sewer Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Hayneville, AL   (Lowndes County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed will generally consist of sanitary sewer lift station improvements at six lift station sites in the Town of Hayneville and provision and installation of two magnetic flow meters generally as follows: BASE BID Lift Station #7: Furnish and install a new 40 HP pump including all electrical improvements, furnish and install a new 4" check valve at existing 90 degree bend in valve box, furnish install new discharge piping to include an insert valve and emergency quick disconnect piping, any required bypass pumping, as well as any other requirements included on project plans. Lift Station #8: Furnish and replace a single 20-HP pump including all electrical improvements, replace an existing 4" ARV, install new 4" quick connect fittings, any required bypass pumping, as well as any other requirements included on project plans. Lift Station #9: Furnish and replace an 11-HP pump including all electrical improvements, straighten and secure existing power supply pole, furnish and replace entire control panel and wiring, secure existing 4" stainless steel vent with all stainless concrete anchor bolts, as well as any other requirements included on project plans. Lift Station #10: Furnish and replace a single 5-HP pump, furnish and replace existing PVC with new stainless steel discharge piping inside and outside the wet well, furnish and install a new valve box with all new valves and check valves, any required bypass pumping, as well as any other requirements included on project plans. ALTERNATE 1 Furnish and install magnetic flow meter and pipe improvements in existing open vault on lagoon effluent discharge line; Furnish and install magnetic flow meter and doghouse manhole on lagoon influent force main; Allowance for SCADC controls for influent/effluent meters ALTERNATE 2 Lift Station #7 Furnish and replace existing piping and valves from pump discharge through exit of valve box. ALTERNATE 3 Lift Station #7 Furnish and install a new valve vault vent pipe. ALTERNATE 4 Lift Station #7 Replace wet well aluminum hatch. ALTERNATE 5 Lift Station #8 - Furnish and replace existing piping and valves from pump discharge through exit of valve box. ALTERNATE 6 Lift Station #8 - Furnish and install a new valve vault vent pipe. ALTERNATE 7 Lift Station #8 Replace wet well aluminum hatch. ALTERNATE 8 Lift Station #9 Furnish and install additional gravel in driveway and inside lift station fence, cut and remove tree on site, renovate existing fencing and install new access gate, and any other improvements.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents