Similar Projects
Ferron and Huntington Creek Stabilization
Results
Castle Dale, UT 84513

Construction of Drainage Project 2021
Results
Castle Dale, UT 84513

NUCK Woodward Creek Watershed Restoration BDA
Infrastructure
Results
Huntington, UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

JWP Museum River Restoration Project
Infrastructure
Post-Bid
Green River, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

North Hills Pond Maintenance Project
Infrastructure
Results
Cedar, UT

Uintah Indian Irrigation Project
Term Contract
Post-Bid
$471,000 est. value

Construction of Drainage Project 2022
Infrastructure
Post-Bid
$300,000 est. value
Castle Dale, UT 84513

Reclamation of BLM Pits, Rochester, South Moore and Lila Canyon
Infrastructure
Post-Bid
$223,000 est. value
Castle Dale, UT

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Results
$698,223 CJ est. value
Huntington, UT 84528

West Drainage Project 2022
Infrastructure
Post-Bid
$400,000 est. value
Green River, UT

CC and H Canal Pipeline Installation Project
Infrastructure
Bidding
$400,000 CJ est. value
Castle Dale, UT 84513

CC and H Canal Pipeline Installation Project
Infrastructure
Bidding
$400,000 CJ est. value
Castle Dale, UT 84513

Last Updated 08/23/2022 08:35 AM
Project Title

Farmington Bay Dyke-Line Restoration

Physical Address View project details and contacts
City, State (County) Orangeville, UT 84537   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide: approximately 17,000 cubic yards of cobble rock required to enhance 24,500 feet (4.6miles) of dike line at Farmington Bay WMA. 11,500 cubic yards of the cobble can be stockpiled in location #1, while 5500 yards could be side dumped directly at location #2. See attached map. In order to turn around for location #1, the driver will have to go the length of the dyke (5 miles) to turn around. The road is good and the turn around area is large. The agency would like the cobble by mid-September 2022. Question Submission Close Date 8/19/2022 2:00 PM MDT

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents