Similar Projects
Jasmine
New Construction
Conception
Columbus, NC 28722

Wallace Road Multi-Family
New Construction
Conception
$75,000,000 est. value
Charlotte, NC 28212

Woodridge Village
Renovation
Design
Mount Olive, NC

Hampton Spring
New Construction
Design
Raleigh, NC

Pinnacle Townhomes
New Construction - 159,200 SF
Post-Bid
$10,000,000 CJ est. value
Wilmington, NC 28411

Radius Dilworth
New Construction - 272,975 SF
Post-Bid
$10,000,000 CJ est. value
Charlotte, NC 28202

Public-Private Partnerships (P3s) For Housing
Results
Rocky Mount, NC

Affordable Housing Development Services
Results
Chapel Hill, NC

Hotel Hinton Rehabilitation
Renovation - 32,000 SF
Construction
$7,000,000 est. value
Edenton, NC 27932

The Edge
New Construction
Construction
Charlotte, NC 28209

600 South Tryon at Legacy Union
New Construction, Renovation
Pending Verification
Charlotte, NC 28202

Birkdale Golf Club Mixed Use
New Construction, Infrastructure - 68,188 SF
Pending Verification
$45,000,000 CJ est. value
Huntersville, NC 28078

White Spring
New Construction
Conception
Winterville, NC

Farrington Trace
New Construction - 102,718 SF
Design
Greenville, NC

Mayfield Affordable Housing
New Construction
Post-Bid
Charlotte, NC 28213

Last Updated 12/08/2022 03:01 PM
Project Title

Apartment Upgrades

Physical Address View project details and contacts
City, State (County) Asheboro, NC 27203   (Randolph County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,400,400 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

*This project will rebid. There is no date for the rebid to take place as of 8/4/2022* New Smoke/Carbon Detectors, Replacement of Bathroom Exhaust Fans, GFCI Receptacles, Refrigerator Breakers, Washing Machine Receptacles, Replacement of Light Fixtures, Appliance Installation, + -Remove all existing battery smoke detectors and turn over to Owner. -Remove all existing hard wired smoke detectors and turn over to Owner. -Provide new hard wired smoke/carbon detectors with 10-year battery at each bedroom, common area and with 15' of any gas fired appliance. -At hearing and visually impaired units provide new hard wired smoke/carbon detectors with strobes. Provide stand alone battery back-up that will operate strobes in case of a power failure. -Remove and replace existing bath room exhaust fans. Provide new exhaust fan. Connect to existing duct work. Fan to be wired to existing vanity light fixture and controlled with new 2 position timer switch. -Provide new bath exhaust fan at bath rooms without exhaust fans now. Provide new 4" diameter hard duct to vent through roof. Provide new metal vent cap on roof. Fan to be wired to existing vanity light fixture and controlled with new 2 position timer switch. -At Owner's directive and per Unit Price: Remove and replace existing GFCI receptacles in all bath rooms and kitchens as required. Refer to Unit Prices in Project Manual. -Remove and replace existing refrigerator breaker at electrical panel with new GFCI protected breaker. -Remove and replace all washing machine receptacles with new GFCI receptacle. -Remove and replace all existing ceiling light fixtures with new led type fixtures. -Provide new anti-tip device to all kitchen ranges. -Disconnect all existing ventilating attic fans. Remove existing wiring complete. Provide new R-38 batt insulation above fan. -At Owner's directive and per Unit Price: Remove and replace existing washer box, drain pipe and p-trap. Provide new washer box, 2" pvc drain pipe and pvc p-trap connected to existing drain line. -Owner to purchase all new refrigerators and ranges. Contractor to unbox and install. Contractor to be responsible for the legal disposal of existing refrigerators and ranges. -Remove all existing wall mounted carbon detectors and turn over to owner. Patch wall as required to blend invisibly with surrounding conditions. -All other work as shown on plans, in project manual and as required by codes and the authority having jurisdiction.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents