Similar Projects
Hurricane Zeta I-110 Marina Repair Project
Infrastructure
Bidding
$100,000 est. value
D'Iberville, MS

Bells Ferry Boardwalk Removal and Replacement Project
Post-Bid
Pass Christian, MS 39571

Repair Marina Piers
Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Biloxi, MS 39530

Installation of Wood Fillers in the Pass Christian Harbor
Results
$160,684 est. value
Pass Christian, MS

West Small Craft Harbor Fishing Pier Hurricane Zeta Repairs
Infrastructure
Results
$601,896 est. value
Pass Christian, MS

Biloxi River Boat Launch Project
Infrastructure
Post-Bid
MS

Hurricane Zeta Repairs East Small Craft Harbor
Infrastructure
Results
$530,288 est. value
Pass Christian, MS

West Biloxi Boat Launch Project
Infrastructure
Post-Bid
MS

Small Craft Harbor Commercial Dock Zeta Repairs
Infrastructure
Results
Biloxi, MS

Repair Marina Piers
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Biloxi, MS

Hiller Park Boat Launch Improvements
New Construction, Infrastructure
Results
$400,000 to $600,000 est. value
Biloxi, MS 39531

Boat Launch Construction
Infrastructure
Post-Bid
Gulfport, MS 39507

Popp's Ferry Causeway Park Floating Dock
Infrastructure
Post-Bid
Biloxi, MS

Small Craft Harbor Fuel Dock
Infrastructure
Post-Bid
Biloxi, MS

Pass Christian Hurricane Zeta Repairs - West Small Craft Harbor
Infrastructure
Post-Bid
Pass Christian, MS

Last Updated 05/25/2022 10:24 AM
Project Title

Schooner Pier Complex - Hurricanes Zeta & Ida Rehabilitation

Physical Address View project details and contacts
City, State (County) Biloxi, MS 39530   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schooner Pier Complex facility repairs from damages incurred from Hurricane Zeta and Ida. Scope includes replacement/repairs of timber and prestressed concrete pile; timber framing replacement/repairs to boardwalks, piers, pavilions, and the main building; electrical repairs; utility service repairs; in-kind replacement of floating wave attenuators and floating docks.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 06 - Wood, Plastics, and Composites.
Division 26 - Electrical.
Division 31 - Earthwork, Driven Piles, Concrete Piles, Precast Concrete Piles.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents