Similar Projects
Installation of a Hot Water Tank and Oil Burner at Stony Brook Elementary School - Sub-Bid
Post-Bid
Brewster, MA 02631

Z--CACO Marconi Water Tower Repair and Painting
Results
$250,000 to $500,000 est. value
Wellfleet, MA

CACO - Temporary Potable Water Storage
Results
Wellfleet, MA

Power Washing of Two Water Storage Facilities
Results
Less than $14,000 est. value
Brewster, MA 02631

Pleasant Lake Elevated Water Storage Tank Improvements
Results
Less than $700,000 est. value
Harwich, MA 02645

Bournedale Tank Rehabilitation and Improvements Project
Results
Less than $300,000 est. value
Sagamore, MA 02562

Sandy Pond Tank Rehabilitation
Post-Bid
Yarmouth, MA

Technology Park Low Service Tank Rehabilitation
Results
Less than $1,600,000 est. value
Falmouth, MA

Installation of a Hot Water Tank and Oil Burner at Stony Brook Elementary School
Post-Bid
Brewster, MA 02631

Cleaning and Coating 2 MG Concrete Water Storage Tank
Results
Less than $100,000 est. value
Sandwich, MA

Greenway Road Tank Rehabilitation
Post-Bid
$872,649 est. value
Mashpee, MA 02649

Sandy Pond Water Storage Tank Rehabilitation
Post-Bid
$350,000 est. value
West Yarmouth, MA

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Back Road Tank Replacement
New Construction
Results
$3,000,000 est. value
Mashpee, MA 02649

Last Updated 04/01/2021 04:12 PM
Project Title

Rotary Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) Bourne, MA   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of coating rehabilitation of the 1.0 MG Rotary Standpipe in Pocasset, Massachusetts, which includes full coating system replacement on the interior and exterior surfaces of the tank and other appurtenant work on tank. The Contractor shall supply all labor, materials and equipment necessary to complete the work contained in the Specifications. All employees that are to work on this project will have to have completed at least the 10-hour OSHA training on construction safety and health. Minimum Wage Rates (Heavy Construction) as determined by the Massachusetts Commissioner of the Department of Labor and Workforce Development shall apply to the labor force on this project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents