Similar Projects
Grand Avenue Viaduct West Of Chicago River - 41362 - City Of Chicago
Renovation
Conception
$6,500,000 est. value
Chicago, IL 60654

Beaver Lane (Wilmette Avenue to North End) - Village of Glenview
Infrastructure, Alteration
Conception
$309,600 est. value
Glenview, IL 60025

RFQ Engineering - Various Engineering Services, Bureau of Research
Term Contract
Design
Chicago, IL 60616

RFQ - FAI 290 (Eisenhower Expwy) at Laramie Avenue, Phase II Engineering Project
Term Contract
Design
$15,099,000 CJ est. value
Chicago, IL 60624

Roadway Reconstruction and Widening
Infrastructure
Bidding
$1,000,000 CJ est. value
Chicago, IL 60652

Roadway and Bridge Reconstruction and Widening
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
South Holland, IL 60473

Lincoln Yards - Dominick Bridge
New Construction
Post-Bid
$35,000,000 est. value
Chicago, IL 60601

Bridge Replacement at Hawthorne Hills
Post-Bid
Elgin, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Elim Bridge Replacement
New Construction, Demolition
Construction
Crestwood, IL

Bridge and Viaduct Painting #16 - 40901 - City of Chicago
Renovation
Conception
$1,500,000 est. value
Chicago, IL

RFQ - Various Phase I Studies, Various Routes, Various Counties
Term Contract
Design
$20,000,000 CJ est. value
Schaumburg, IL 60194

Parking Lot Repaving
Infrastructure
Bidding
$1,000,000 CJ est. value
Hines, IL 60141

Large Riding Floor Sweeper/Scrubber
Post-Bid
Arlington Heights, IL

Last Updated 07/22/2022 05:36 AM
Project Title

RFQ - Various Phase II District Wide Pavement and Bridge Preservation Projects, Various Routes, Various Counties

Physical Address View project details and contacts
City, State (County) Schaumburg, IL 60194   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $35,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. D-91-159-22, Various Phase II District Wide Pavement & Bridge Preservation Projects, Various Routes, Various Counties, Region One/District One. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 27, 2022, at 9:00 AM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for work related to contract plan preparation for bridge improvements on the interstate system, development of specifications and construction cost estimates, surveying for various projects in District One. Work orders under the blanket agreement will be negotiated and authorized by the department on an as-needed basis. Work Orders will include preparation of contract plans for various projects on the interstate involving roadway, bridge repairs and improvements, deck overlay details, drainage improvement plans, preparation of miscellaneous roadway details and structure details (TS&L plans, structure plans), ADA ramp details, review of plans by Consultants and local agency Consultants for roadway and bridge rehabilitation projects, obtaining pavement composition cores for resurfacing projects, geotechnical borings for structure designs and providing supplemental field and bridge deck surveying. The primary focus on the scope for the work orders will be structures related. The estimated construction cost of these projects may range from $1,000,000 to $35,000,000. The estimated engineering fee for this project is $3,500,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 012 - RFQ - Various Phase II District Wide Pavement and Bridge Preservation Projects, Various Routes, Various Counties *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents