Similar Projects
Central High School and Grand Rapids Montessori Elementary Renovation & Site Improvements
New Construction, Renovation
Design
Grand Rapids, MI 49503

PB-4 Administration, District Services and FSE Renovations
Renovation
Bidding
$4,000,000 est. value
Byron Center, MI 49315

2019 School Bond Projects Redesign
Renovation
Bidding
Pickford, MI

High School Grandstand and Restroom Renovation
Renovation
Post-Bid
Allendale, MI

Clarkston 2016 Bond Projects - Bid Package 9
Post-Bid
Clarkston, MI

Construction Management Services
Results
Ann Arbor, MI

Summer Renovations
Results
Ann Arbor, MI

Renovations to District Offices at Liberty School
Renovation
Construction
Saline, MI

High School - Middle School Classrooms
Renovation - 57,600 SF
Construction
$1,500,000 to $2,000,000 est. value
Muskegon, MI 49441

Seaholm Maintenance Building
Renovation
Bidding
Birmingham, MI

Center Line High School Renovations
Renovation
Post-Bid
Center Line, MI

Clarenceville Schools: Bathroom Renovations
Results
Livonia, MI

Brother Rice High School - Locker Room & Academics Renovations - Phase 1B
Renovation - 19,550 SF
Construction
Bloomfield Hills, MI 48301

Alternative Education Center Renovations
Renovation
Post-Bid
Center Line, MI

Van Hoosen Middle School Renovations 2020
Renovation
Results
Rochester, MI 48306

Last Updated 09/23/2021 09:19 AM
Project Title

Undergo Interior Renovations and Upgrades to the Existing Facility.

Physical Address View project details and contacts
City, State (County) Coldwater, MI 49036   (Branch County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Portions of the career center will undergo interior renovations and upgrades to the existing facility. Work will consist of installing a new elevator, creating new classrooms in an existing mezzanine, adding in a new counseling suite, reworking the existing kitchen, and other miscellaneous renovations. Two alternates are being included for classroom/training room additions on the south end of the school.

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents