Similar Projects
Residential Home Repair Composition Roof Repair/Replacement
Renovation
Sub-Bidding
$50,000 CJ est. value
Tacoma, WA 98405

Health and Human Services (HHS) Roof Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Longview, WA 98632

Port of Bellingham Re-Roof International Trades Building
Alteration
Post-Bid
$360,000 est. value
Bellingham, WA

Dirtworks Gazebo Roof Replacement project
Alteration
Post-Bid
Olympia, WA

Roofing Services
Term Contract
Results
$272,484 est. value
Seattle, WA

Fleet Services Roof Replacement
Alteration
Results
Seattle, WA

Palmer Student Center Roof Repairs
Renovation
Sub-Bidding
$267,000 CJ est. value
Shelton, WA 98584

Roof Replacement at Glenhaven Condominiums
Alteration
Post-Bid
Langley, WA 98260

Wallenstien Performing Arts Roof Replacement
Alteration
Results
$375,000 to $480,000 est. value
Moses Lake, WA 98837

FY2022-23 Union High School Phase 2 Partial Roof Replacement
Renovation
Sub-Bidding
$1,340,000 CJ est. value
Camas, WA 98607

Arlington Library Roof Replacement
Alteration
Post-Bid
Arlington, WA 98223

Weatherization Residential Insulation 8560
Alteration
Results
WA

Roof Replacement at Woodridge Park Apartments
Renovation
Sub-Bidding
$160,183 CJ est. value
Seattle, WA 98168

Weatherization - URGENT Roof
Alteration
Post-Bid
WA

Weatherization Residential Insulation 8554
Alteration
Results
WA

Last Updated 03/01/2023 10:34 PM
Project Title

FY2022-23 Evergreen High School Covered Walkway Roof Replacement

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98684   (Clark County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $213,031 [brand] Estimate
Plans Available from Copy Center - 02/01/23
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The Contractor will provide all labor, equipment, materials, project management, and site supervision as required to complete the Evergreen High School Covered Walkway Roof Replacement scope of work described in the project drawings and specifications. Evergreen High School - 14300 NE 18th Street, Vancouver, WA 98684 The project is estimated to cost $215,000. Bids will be opened and read aloud immediately after the bid closing time for their receipt, at which time all interested persons are entitled to attend the bid opening. In addition, arrangements can be made to view printed copies of the bid documents by calling the locations listed below: Evergreen Public Schools Facilities Department 13413 NE LeRoy Haagen Memorial Dr. Vancouver WA 98684 360-604-4077 360-604-4112 No Bid will be considered unless it is in complete accordance with the instructions to bidders and is submitted upon the official bid form provided to prospective bidders (included in the bid documents). Each bid must be accompanied by bid security in the form of a bid bond for not less than five percent (5%) of the base bid amount, excluding applicable State of Washington taxes. Bid security shall be forfeited as damages should the Bidder neglect or refuse to enter into a contract and provide a suitable bond for performance/payment for labor and materials. The Board of Directors of Evergreen Public Schools reserves the right to reject any or all bids or portions thereof and waive any informality or irregularities. Date of Substantial Completion of the Work: August 25, 2023 Date of Final Completion of the Work: Fifteen (15) days after reaching Substantial Completion

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents