Similar Projects
St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14, St. Johns County, Florida
Post-Bid
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Santa Maria Boulevard Drainage Improvements
Results
Less than $2,173,000 est. value
Saint Augustine, FL 32084

3rd Alley Ditch Drainage Improvements
Results
Saint Augustine, FL 32080

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Deep Creek Conservation Area - Ditch Blocks Installation
Results
Less than $59,310 est. value
FL

Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St. Johns County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Second Call - Halfmile Creek Mitigation Area, Trail Road Improvements and Low Water Crossing
Results
Less than $22,000 est. value
FL

Fabrication and Installation of Removable Flood Barriers for the Waste Water Treatment Plant
Results
Saint Augustine, FL

FEMA Project - Old A1A South Berm Restoration
Results
Less than $1,152,098 est. value
FL

CDBG-DR Project: Avenue D and Tart Road Drainage Improvements
Results
Less than $680,364 est. value
Saint Augustine, FL 32084

Drainage Repair on SR 207
Results
Less than $240,000 est. value
FL

Design-Build Services for Hurricane Matthew FEMA Cat. B Emergency Berm Restoration
Results
Less than $11,584,996 est. value
FL

Marsh Flow-Way C1 and C2 Maintenance Improvements
Results
Less than $1,760,000 est. value
FL

Side Drain Replacement
Results
Less than $250,000 est. value
FL

Last Updated 07/22/2021 08:13 AM
Project Title

CDBG-DR Project - St. Augustine Boulevard and Cypress Road Drainage Improvements

Physical Address View project details and contacts
City, State (County) FL 32086   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,619,078
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to improve the cross drain at Sawmill Landing Drive, construct (2) new cross drains beneath Hilltop Road and construct two (2) new cross drains beneath the St. Augustine Boulevard / Cypress Road intersection, regrade outfall ditches from St. Augustine Boulevard to Sawmill Landing Drive, and to convert Cypress Road from an open collection system to a closed collection system from just east of San Juan Drive to just west of Richie Drive. Work also includes erosion control measures, pavement cuts/repairs, maintenance of traffic, signing, pavement marking, fencing, and utility adjustments. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the Plans, SJCUD Manual of Water, Wastewater and Reuse Design Standards and Specifications, permit requirements, and terms of the Contract.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents