Similar Projects
Rock County - Orfordville Salt Shed
New Construction, Infrastructure - 6,624 SF
Bidding
$800,000 CJ est. value
Orfordville, WI 53576

Door Creek Park Shelter
Infrastructure - 4,000 SF
Bidding
$2,565,000 CJ est. value
Madison, WI 53718

AD 18 Sidewalk Sawcutting 2023
Infrastructure
Sub-Bidding
$40,000 CJ est. value
Madison, WI 53715

Concrete Maintenance and Replacement
Term Contract
Sub-Bidding
Appleton, WI 54911

Concrete Blocks For New South Landfill
Alteration
Post-Bid
WI

LE Phillips Memorial Library - Concrete Polishing Bid Package 05
Alteration
Post-Bid
Eau Claire, WI 54701

Concrete Repair South End of Grounds and Youth Center State Fair Park
Alteration
Results
$215,000 est. value
West Allis, WI

Townhomes at Carver Park - Metal Roofing, Landscaping, Concrete Repairs and Sidewalk Mudjacking, Parking Area Improvements, Final Remodel Turnover Cleaning
Infrastructure, Alteration
Results
Milwaukee, WI

Entrance and Terrace Renovation University Center University of Wisconsin - River Falls - GPC
Renovation
Construction
$359,817 CJ est. value
River Falls, WI 54022

Chiller #1 Overhaul Heating & Cooling Plant
Renovation
Construction
$96,975 CJ est. value
Kenosha, WI 53144

2023 Semi-Permanent Epoxy Pavement Marking
Infrastructure
Bidding
$143,625 CJ est. value
Madison, WI 53715

Sealcoat
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Glen Haven, WI 53810

Beloit Readiness Center Construct Trash Enclosure
Alteration
Post-Bid
Beloit, WI 53511

Building 3.1
Alteration
Results
Milwaukee, WI

Install Storm Sewer Piping
Infrastructure, Renovation
Construction
$178,689 CJ est. value
Fort McCoy, WI 54656

Last Updated 02/24/2023 04:36 PM
Project Title

Chiller Plant Unit 1 Replacement MEP

Physical Address View project details and contacts
City, State (County) La Crosse, WI 54601   (La Crosse County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,433,733 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of installing a new 1300-ton centrifugal chiller, associated cooling tower and pumps within West Chiller Plant. Work also includes installation of approximately 900 lineal feet each of underground chilled water supply and return piping as well as the associated site work needed to accommodate the new chilled water piping. Entire project area will be restored to original conditions Notice is hereby given in accordance with Section 16.855(10), Wisconsin Statutes, that the Division believes it is in the best interests of the State to contract the following work from only one source, without the usual statutory procedures Base Bids will be received as a single lump sum bid for: 3) Plumbing; 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Bid_Results : MECHANICAL WORK North American Mechanical, Inc : $ 2,280,000.00 ELECTRICAL WORK Poellinger Electric, Inc. $ 153,733.00

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents