Similar Projects
Manitowish - Hurley Const / Resurface
Infrastructure
Conception
$750,000 CJ est. value
Manitowish Waters, WI 54545

Manitowish - Hurley Const / Resurface
Infrastructure
Conception
$750,000 CJ est. value
Manitowish Waters, WI 54545

Range Concrete Work
Infrastructure
Design
$80,000 CJ est. value
Boulder Junction, WI 54512

Range Concrete Work
Infrastructure
Design
$80,000 CJ est. value
Boulder Junction, WI 54512

Blacktop Work of Hall Road and Schuman Road
Infrastructure
Post-Bid
$376,000 est. value
Woodruff, WI 54568

Thermoplastic Roads
Infrastructure
Post-Bid
$400,000 est. value
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Roadwork Birch Springs Road
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Woodruff - Eagle River, CTH H - USH 45 North
Infrastructure
Results
$75,000 est. value
WI

Crack Sealing
Infrastructure
Post-Bid
$60,000 est. value
Phelps, WI

Found Lake Road Improvements Phase 2
Infrastructure
Results
Saint Germain, WI

Forest Edge Apartments - LDF
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Lac du Flambeau, WI 54538

Last Updated 03/21/2023 04:11 PM
Project Title

2023 Alley Reconstruction

Physical Address View project details and contacts
City, State (County) Eagle River, WI 54521   (Vilas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $149,745 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: 1400 S.Y. Salvage Existing Asphalt Pavement 850 C.Y. Unclassified Excavation 1650 S.Y. Geogrid Subgrade Reinforcement 275 C.Y. Breaker Run Gravel 500 C.Y. Crushed Aggregate Base Course 280 TON Asphaltic Pavement Associated Traffic Control, Erosion Control, & Turf Restoration No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents