Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Contractor - Lead Private Service Line Replacement Program
Infrastructure
Design
Shorewood, WI

RFP Engineering - Design Services for Playground Improvements - Emigh and Wick Playfields
Infrastructure
Bidding
$3,000,000 CJ est. value
Milwaukee, WI 53202

RFP Engineering - Potter Road and 109th Street Utilities and Paving Design
Infrastructure
Bidding
$500,000 CJ est. value
Wauwatosa, WI 53213

Engineering, Planning and Development
Post-Bid

Update Existing Engineering Data Documentation For Existing Mechanical Ventilation Systems
Term Contract
Post-Bid
Milwaukee, WI

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

UWMIL Central Heating Plant Chiller Replacement
Renovation
Design
$13,360,000 CJ est. value
Milwaukee, WI 53202

RFP Engineering - Perpetuation - Pavement Replacement
Infrastructure
Bidding
$10,000,000 CJ est. value
Milwaukee, WI 53204

Urban Design Services
Term Contract
Post-Bid
Milwaukee, WI

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

RFP Engineering - Perpetuation - Pavement Replacement
Infrastructure
Bidding
$4,000,000 CJ est. value
Oak Creek, WI 53154

2022 Alley Reconstruction Program Engineering and Inspection Services
Infrastructure
Post-Bid
Shorewood, WI

W Layton Ave (CTH Y) Reconstruction
Results
Greenfield, WI 53220

Last Updated 10/18/2022 02:33 PM
Project Title

RFP Engineering - Perpetuation - STH 38 - Resurfacing Howell Ave

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53202   (Milwaukee County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $10,999,999 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 18, 2022, this project is in the conceptual phase. An engineer firm has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2023. *The closed solicitation has been included below for reference: Perpetuation projects to mill and overlay roadways in Milwaukee County. 2060-20-00 Mill 3" and resurface 3" approximately 6.56 miles of STH 38 from Oakwood Road to Grange Ave. within both the cities of Oak Creek and Milwaukee. Curb ramps will be evaluated for compliance throughout the project. Signal work to be completed at the following intersections with STH 38: Oakwood Road (add monotubes), STH 100, Centennial Drive, Puetz Road, Forest Hill Road, Susan Drive, Drexel Avenue, Rawson Avenue, College Avenue, STH 119 EB Ramp, and Grange Avenue. Majority of signal work is to remove Autoscope cameras and replace with base-patched loops. Decking sealing to be completed at B-40-0294/5, patching storm sewer pipes that enter culvert at B-40-0296, recoating epoxy slope paving at B-40-0484/5, and concrete surface repairs at C-40-0050. Anticipated Construction Cost: $10,000,000-$10,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview:Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Perpetuation - Resurfacing Howell Ave *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents