Similar Projects
Restoration of the Barge and Boat Landing and Assorted Waterfront Features
Results
Miami, FL 33129

Doral Pedestrian Bridge Design Build
Post-Bid
$4,800,000 est. value
Doral, FL

Bridge Replacement at SW 136 Street Over C-100A Canal - Bridge No. 874420
New Construction
Post-Bid
$1,707,083 est. value
FL

Bridge and Concrete Maintenance
Results
Less than $400,000 est. value

Bridge Deck Striping
Results
Less than $500,000 est. value

Districtwide Movable Bridge Asset Maintenance-Performance Ba
Results
Less than $25,900,000 est. value

Maintenance and Repair of Existing Bridge, Overhead Sign Structures and Traffic Signals Mast Arms (TSMA)
Results
Less than $500,000 est. value

West Mashta Drive Bridge Repairs
Results
Key Biscayne, FL 33149

Bridge-Repair/Rehabilitation
Results
Less than $362,978 est. value
FL

Bridge-Repair/Rehabilitation and Resurfacing
Results
Less than $11,607,535 est. value
FL

Southwest 42nd Avenue Over Coral Gables Canal Bridge No. 874275 Beam Repairs
Results
Less than $84,658 est. value
Miami, FL 33128

Caribbean Boulevard Bridge Replacement - Bridge No. 874431
Results
Less than $2,246,931 est. value
Miami, FL 33189

Bridge-Repair/Rehabilitation
Results
Less than $920,783 est. value
FL

Rehabilitation of Snapped Tendons in a Prestressed U-Channel Section on Bridge
Bidding
Bay Harbor Islands, FL

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Last Updated 06/16/2020 11:27 AM
Project Title

77th Street Bridge Over E Biscayne Point Canal Repairs

Physical Address View project details and contacts
City, State (County) Miami Beach, FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

77th Street Bridge over E. Biscayne Point Canal is located between Hawthorne and Noremac Avenues within Biscayne Point neighborhood. According to the recent Florida Department of Transportation (FDOT) Bridge Inspection Reports from the years of 2010 to 2018, this bridge has consistently received a sufficiency rating of 45.1. Due to the rating being below FDOT recommended minimum of 70, the improvements are proposed to bring the bridge into compliance. The services of this project include improvements to both the superstructure and the substructure of the bridge. Elements of the bridge affected by the repairs are identified in the plans and specifications. The major items of construction include: repairing cracks, spalls, and delamination of concrete. Also, it includes an expansion joint replacement, rebar placement, and installation of pile jackets

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents