Similar Projects
Bridge Reconstruction Program - 11086 - City of Sioux Falls
Demolition, New Construction, Infrastructure
Conception
$14,585,000 CJ est. value
Sioux Falls, SD 57104

Bridge Reconstruction Program - 11086 - City of Sioux Falls
Demolition, New Construction, Infrastructure
Conception
$14,585,000 CJ est. value
Sioux Falls, SD 57104

Arrowhead Parkway Improvements - 11064 - City of Sioux Falls
Infrastructure
Design
$9,410,000 est. value
Sioux Falls, SD 57110

Dance Gallery / Sioux Falls
New Construction, Infrastructure - 20,000 SF
Design
$5,000,000 CJ est. value
Sioux Falls, SD 57105

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Highway 149 Reconstruction
Infrastructure
Post-Bid
$4,250,000 est. value
SD

Chip Sealing and Crack Sealing
Infrastructure
Post-Bid
SD

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Willow Avenue Improvements
Infrastructure
Results
$664,000 est. value
Sioux Falls, SD 57104

WholeStone Farms Pork Harvesting And Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Sioux Falls, SD 57104

1st Avenue Mixed Use Development
New Construction, Infrastructure - 5,000 SF
Pending Verification
$28,000,000 CJ est. value
Sioux Falls, SD 57104

RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Augustana South Resident Hall
New Construction, Infrastructure
Design
$15,189,916 CJ est. value
Sioux Falls, SD 57197

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Structure 332 Steel Girder , Gravity Large Concrete Block Wall
Infrastructure
Results
SD

Last Updated 03/14/2023 07:37 AM
Project Title

LSDC Overlay, Approach Slabs, Approach Pavement, Approach Guardrail

Physical Address View project details and contacts
City, State (County) Renner, SD 57055   (Minnehaha County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $4,594,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I29 NBL & SBL - Strs 0.3 N of 26th St over Skunk Ck, Over 12th St (Exit 79), 0.3 N of 12th St over Ellis & Eastern RR Length 0.0 As of March 14, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - LSDC Overlay, Approach Slabs, Approach Pavement, Approach Guardrail *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents