Similar Projects
RFQ Design - Dwinelle Hall Annex - Renovation for Disabled Students Program Center
Renovation - 8,500 SF
Conception
$7,000,000 CJ est. value
Berkeley, CA 94704

RFQ Contractor- Moffitt Library Renovation of Floors 1, 2 & 3
Renovation - 45,000 SF
Bidding
$17,400,000 CJ est. value
Berkeley, CA 94704

RFQ D/B - CSU East Bay Stadium Track and Field Improvement
Renovation, Infrastructure
Bidding
$380,000 CJ est. value
Hayward, CA 94542

California State University East Bay Job Order Contract
New Construction
Post-Bid
Hayward, CA

Construction Manager - Academic Seismic Replacement Building
New Construction - 78,000 SF
Post-Bid
$90,000,000 est. value
Berkeley, CA

Merritt College New Landscape Horticulture Complex Project
Addition, Demolition, Renovation, Infrastructure
Results
$24,495,000 CJ est. value
Oakland, CA 94619

UC Berkeley Etcheverry Rooms 1109 and 1111 Renovation
Renovation
Results
$290,000 est. value
Berkeley, CA 94709

Samuel Merritt University New Campus
New Construction, Infrastructure - 240,000 SF
Pending Verification
$100,000,000 CJ est. value
Oakland, CA 94607

Samuel Merritt University New Campus
New Construction, Infrastructure - 237,629 SF
Pending Verification
$100,000,000 CJ est. value
Oakland, CA 94607

RFQ Construction Manager - Construction Management Services for Moffitt Library Seismic Safety
Renovation
Post-Bid
$2,600,000 est. value
Berkeley, CA 94720

Recreational Sports Facility Entrance Lobby Modification
Renovation
Results
$470,000 est. value
Berkeley, CA 94720

UC Berkeley Apparatus Bay Replacement Structure / RCNR Replacement Structure
New Construction
Post-Bid
$1,500,000 est. value
Berkeley, CA

UC Berkeley Simpson Center North Training Room Renovation
Renovation - 2,873 SF
Results
$447,586 CJ est. value
Berkeley, CA 94704

Construction Manager - Various Projects and Heathcock Hall
New Construction
Post-Bid
$120,000,000 to $130,000,000 est. value
Berkeley, CA

UC Berkeley Academic Seismic Replacement Building
Demolition, LEED Certification, New Construction, Infrastructure - 78,000 SF
Results
$9,114,205 CJ est. value
Berkeley, CA 94704

Last Updated 03/27/2023 06:07 PM
Project Title

RFP D/B - Li Ka Shing 3T MRI Replacement

Physical Address View project details and contacts
City, State (County) Berkeley, CA 94720   (Alameda County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Brain Imaging Center in the Li Ka Shing Center on the campus of the University of California, Berkeley intends to replace an existing Siemens 3T MRI with a new Siemens 3T MRI. The primary rooms affected by this scope of work include B100E (Control Room), B100EA (Magnet Room), and B100F (Equipment Room). The campus seeks a design builder to design and construct the necessary room improvements and infrastructure extensions to accommodate the installation of the new MRI and support equipment, The basis of design is Siemens Magnetom 3T Prisma. Removal of the existing MRI equipment and installation of the new MRI and equipment is the responsibility of Siemens. In addition to designing and constructing/demolishing/restoring select building components and systems in order facilitate removal of the existing MRI, the design builder will provide support to the Siemens team during the installation and connection of the new MRI. The University reserves the right to reject any or all responses to Prequalification Questionnaires and any or all proposals and to waive non-material irregularities in any response or proposal received. Prequalified proposers will be required to have the following California contractor's license: General Building Contractor, B license Bid bond 10% 100% payment and 100% performance bond Questions about this PREQUALIFICATION or the project should be submitted using Building Connected by using the “Message” Tab no later than 3:30p.m. PST on FEBRUARY 24, 2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents