Similar Projects
Summit Street Water Storage Tank Painting - WS.28 - City of Brighton
Infrastructure
Conception
$775,000 CJ est. value
Brighton, MI 48116

Rehabilitation of Pine Creek Lift Stations - City of Brighton
Infrastructure
Conception
$517,000 CJ est. value
Brighton, MI 48116

Catholic Healthcare International Church / Padre Pio
New Construction, Infrastructure - 6,090 SF
Design
$1,200,000 CJ est. value
Howell, MI 48843

St Joseph Mercy - Brighton Expansion & Renovations / Trinity Health
New Construction, Renovation, Infrastructure - 209,326 SF
Design
$238,200,000 CJ est. value
Brighton, MI 48114

Main Street Streetscape
Infrastructure
Bidding
$4,573,700 CJ est. value
Brighton, MI 48116

RFQ Construction Manager - Marion Township Hall Expansion
Addition, Demolition, Infrastructure
Bidding
$4,000,000 CJ est. value
Howell, MI 48843

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

East Grand River Water Main Improvements
Infrastructure
Results
$2,599,147 CJ est. value
Howell, MI 48843

East Grand River Water Main Improvements
Infrastructure
Results
$2,599,147 CJ est. value
Howell, MI 48843

U-M Health Brighton Center for Specialty Care Linear Accelerator Expansion
Addition, Infrastructure - 2,200 SF
Construction
$750,000 CJ est. value
Brighton, MI 48116

Howell Storage Marion D19 Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Howell, MI 48843

Brighton Cove Apartments Sanitary Pump Station Replacement
Infrastructure
Pending Verification
$200,000 CJ est. value
Brighton, MI 48116

AutoZone #5732 / Fowlerville
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Fowlerville, MI 48836

Three-Way Valve
Infrastructure
Post-Bid
MI

Last Updated 01/16/2023 10:31 PM
Project Title

LCWA Water Main System Improvements

Physical Address View project details and contacts
City, State (County) Brighton, MI 48116   (Livingston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $6,473,765 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of water main replacement and water main construction for the multiple locations listed below, in three divisions: Division A: The CC Annex neighborhood water main replacement project. This includes the following streets: Leland Street, Van Winkle Street, Ethel Street, Military Drive, Saunders Street, Clara Jean Street, Burson Drive, and Weber Street. Approximately 14,200 feet of 8-inch water main is proposed for replacement within this subdivision. Division B: The next location is 12-inch Loop starting at the Brighton Area Schools bus yard is approximately 1,000 feet of the total 4,300 feet of newly proposed 12-inch water main needed to complete the redundant loop from behind Kroger to Lee Road. Division C: The final locations include two (2) proposed directional drill installations of 24-inch water main crossings beneath US-23 in two locations: one crossing approximately 2,600 feet north of Lee Road, south of the existing 24-inch water main crossing, and the second proposed crossing approximately 1,200 feet south of Lee Road, south of the existing 24-inch water main crossing. DEPOSIT: 5% of bid amount No bid may be withdrawn for a period of 120 calendar days after the scheduled closing time for receipt of the Bids. This period may be extended by mutual agreement of the Owner and any Bidder or Bidders. The OWNER reserves the right to accept any or all Bids and award the contract to other than the lowest bidder, to waive any irregularities or informalities or both; to reject any or all Bids; and in general to make the award of the Contract in any manner deemed by the OWNER, in its sole discretion, to be in the best interest of the OWNER. The OWNER also reserves the right to award the project based on any combination of Divisions A, B, and C including eliminating any Division. Pre-Bid questions may be directed to rich.hobgood@ohm-advisors.com by 2:00 PM on December 1st, 2022. The bus yard first phase for a water main loop is approximately 1,000 feet of the total 4,300 feet of 12-inch water main needed to complete the redundant loop from Kroger to Lee Road. 213071

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents