Similar Projects
Jubilee Westwood School
Renovation
Post-Bid
San Antonio, TX 78227

Miller`s Point Elementary School Modernizations and Improvements
Renovation, Addition
Post-Bid
Less than $3,285,000 est. value
Converse, TX 78109

Randolph Elementary School Replacement
Demolition - 39,000 SF
Results
Less than $13,400,000 est. value
Universal City, TX 78148

Library Additions/Renovations at Passmore Elementary School
Renovation, Addition
Results
San Antonio, TX 78227

Northside Independent School District Westwood Terrace ES Building Replacement
Construction
Less than $10,735,000 est. value
San Antonio, TX 78227

Fm 471 N Area #4 Elementary School
New Construction
Post-Bid
Less than $24,000,000 est. value
San Antonio, TX 78254

Phase II Renovations at YWLA Primary
Results
$375,000 est. value
San Antonio, TX 78210

Modernization and Improvements to Olympia Elementary School, Judson ISD
Renovation
Post-Bid
Live Oak, TX 78148

Rodriguez Montessori Elementary School Renovations
Renovation
Results
$850,000 est. value
San Antonio, TX 78207

Paschall Elementary School Modernizations & Improvements
Renovation
Post-Bid
San Antonio, TX 78244

Steele Montessori Academy Cosmetic Renovations
Renovation
Results
Less than $180,550 est. value
San Antonio, TX 78200

Spring Meadow Elementary School - Modernization and Improvements
Renovation
Post-Bid
$1,300,000 est. value
San Antonio, TX 78244

Elolf Elementary School Modernizations and Improvements
Renovation - 2,700 SF
Results
Less than $3,368,000 est. value
Converse, TX 78109

Crestview Elementary School Modernizations and Improvements
Renovation, Addition
Post-Bid
Less than $4,544,500 est. value
Live Oak, TX 78233

Disaster Recovery Services
Results

Last Updated 07/22/2020 11:07 AM
Project Title

Convert Existing Locker Room to Dance Studio at YWLA Primary at Page

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78210   (Bexar County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $190,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Convert Existing Locker Room to Dance Studio at YWLA Primary at Page. The estimated construction budget is $190,000 ,which includes a $25,000 Contingency and a $25,000 Graphics Allowance.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents