Similar Projects
St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

Walworth - Elkhorn, Geneva Street to Glenwood Drive; Walworth - Elkhorn, Geneva Street to Glenwood Drive
Infrastructure
Bidding
$2,000,000 CJ est. value
Elkhorn, WI 53121

Walworth - Elkhorn, Geneva Street to Glenwood Drive; Walworth - Elkhorn, Geneva Street to Glenwood Drive
Infrastructure
Bidding
$2,000,000 CJ est. value
Elkhorn, WI 53121

2021 Joint and Crack Filling
Infrastructure
Post-Bid
Lake Geneva, WI

2022 Street and Utility Improvements
Infrastructure
Post-Bid
Delavan, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Road Improvements
Results
Lyons, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Schwager Drive Reconstruction
Infrastructure
Pending Verification
$1,538,400 CJ est. value
Whitewater, WI 53190

Schwager Drive Reconstruction
Infrastructure
Pending Verification
$1,538,400 CJ est. value
Whitewater, WI 53190

Richmond - Whitewater, CTH A to Willis Ray Road
Infrastructure
Bidding
$4,000,000 CJ est. value
Whitewater, WI 53190

Crack Filling Various Town Roads
Infrastructure
Post-Bid
Delavan, WI

Construction of the Third Street Alley and Theater Drainage
Infrastructure
Results
$102,370 est. value
WI

Last Updated 12/12/2022 11:34 AM
Project Title

2023 Street Improvement Project - Phase 3 - Wrigley Drive ADA Improvements

Physical Address View project details and contacts
City, State (County) Lake Geneva, WI 53147   (Walworth County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of City Of Lake Geneva 2023 Street Improvement Project - Phase 3 - Wrigley Drive ADA Improvements The work for which bids are asked includes the following: The City Of Lake Geneva 2023 Street Improvement Project - Phase 3 Wrigley Drive Ada Improvements project includes work for pavement replacement, replacement of poor road base where needed, spot replacement of curb & gutter, and sidewalk repair and replacement including curb ramps. Wrigley Drive is planned for full depth mill and replacement of the existing asphalt surface, spot replacement of curb & gutter, sidewalk repairs including removal and replacement of existing curb ramps that do not meet current standards. The existing sidewalk along the south side of Wrigley Drive is being widened with a two-foot strip of thickened edge concrete sidewalk. Structure casting and gate valve box adjustments and replacements will be done as needed within project limits. The anticipated substantial completion date is May 12, 2023 and final completion date is May 23, 2023. Planholders list will be updated interactively on electronically. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Mike Christenson, 1702 Pankratz Street, Madison, WI 53704. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. The project in the City of Lake Geneva is funded in part by the Wisconsin Department of Transportation Local Road Improvement Program (LRIP). No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents